Solar panel and battery installation: fitting both at once
How a combined solar and battery installation is designed, sited and connected, and the paperwork to ask for.
Quick answer
Fitting a battery at the same time as the panels means one design, one scaffold, one set of grid paperwork and one handover. The battery has to be sited to PAS 63100:2024 (outdoors where practicable, never in a loft or roof space), a battery that can export counts towards the grid limit, so a combined system often needs a G99 application before it is connected, and installation is zero-rated for VAT until 31 March 2027.
Why fit the panels and the battery together?
Most of the cost of a solar job that is not hardware is the work around it: the scaffold, the visit, the electrical work at the consumer unit, and the paperwork with the network operator. When the battery goes in with the panels, that work is done once, the system is designed around both from the start, and you get a single handover pack covering both. If you are fitting panels alone, the guide to solar panel installation covers a panels-only job from survey to switch-on.
The design choice that follows is the inverter. A hybrid inverter runs the panels and the battery through one unit, so it is the usual choice when both are installed together; a battery with its own inverter (AC-coupled) is the usual way to add storage to panels that are already on the roof. The solar battery installation guide covers that coupling choice and battery-only retrofits in more detail. If the battery is coming later, ask for an inverter that can take one, so the panels do not need rewiring. If an electric car is part of the plan, charging an electric car with solar panels shows how much daytime surplus a car can really use.
Where can the battery go?
PAS 63100:2024 is the BSI specification on fire protection for home battery systems. It says a battery should go outdoors where practicable, and a detached outbuilding not used for living in counts as outdoors. A garage or utility room can work if it is ventilated to outside, fire-separated from bedrooms and escape routes, and covered by smoke detection where it is rarely visited. Lofts and roof spaces are ruled out.
The guides to a home battery in the garage, utility room, loft or outside and where a home battery should go under PAS 63100 set out the checks for each location. Settle the location before you compare quotes, because it decides the cable route and sometimes the battery itself.
Planning panels and a battery?
G98 or G99 with a battery
Every grid-connected system has to be cleared with the local network operator. Up to 16 A per phase, which is 3.68 kW on a single-phase supply (about 11 kW on three-phase), the installer connects the system and then notifies the operator within 28 days under G98. Above that limit, the installer applies under G99 and waits for the operator to approve the system before it is connected.
A battery that can export counts towards that limit, so panels and a battery together can push a home past 3.68 kW even when each part on its own would not. Ask each installer which route your design needs and who submits the application. The G98 vs G99 guide explains both routes.
Standards and paperwork to ask for
- MCS certification for the solar work, and certification to MIS 3012, the MCS battery standard, for the battery. MIS 3002 says that where a quote shows self-consumption with battery storage, it must make clear if the installer is not certified to MIS 3012.
- An Electrical Installation Certificate for the work at the consumer unit.
- The G98 notification or the G99 approval from the network operator.
- The battery location in writing, checked against PAS 63100.
- Warranty registrations for the panels, the inverter and the battery.
VAT and what it costs
Installing solar panels and batteries in a home in Great Britain is zero-rated for VAT until 31 March 2027; from 1 April 2027 the rate reverts to 5% (HMRC VAT Notice 708/6). Standalone and retrofit batteries are in scope as well as batteries fitted with new panels.
The government’s solar cost data leaves batteries out, so this guide does not publish a battery price. The solar panel installation cost guide sets out what the panels cost at each system size; ask every installer to show the battery, and any change to the inverter, as separate lines so the quotes compare like with like.
Questions to put to every installer
- Is the inverter hybrid, or will the battery have its own inverter, and why?
- Where will the battery go, and how does that meet PAS 63100?
- Will the system be G98 or G99, and who applies?
- Are you certified to MIS 3012 as well as for solar?
- Which lines on the quote are the battery, and which are the panels?
Solar panel and battery questions
Is it better to install a battery at the same time as solar panels?
Usually, if you want one. Fitting both together means one scaffold, one visit and one set of grid paperwork, and the inverter can be chosen for both from the start. Compare quotes line by line, because prices vary.
Do I need G99 for solar panels and a battery?
Often, yes. A battery that can export counts towards the 16 A per phase limit (3.68 kW on single-phase). Above that, the installer must apply under G99 and get the network operator’s approval before connecting.
Can a home battery go in the loft?
No. PAS 63100:2024 rules out lofts and roof spaces. It prefers outdoors where practicable; a garage or utility room can work if it is ventilated to outside, fire-separated and covered by smoke detection.
Is there VAT on a solar battery?
Not until 31 March 2027. Installing solar panels and batteries in a home in Great Britain is zero-rated for VAT until 31 March 2027; from 1 April 2027 the rate reverts to 5% (HMRC VAT Notice 708/6).