solarpanelsandinstallation

E.ON Next solar panels: what E.ON offers and how installation works

Updated 23 October 2026 · SEO Dons Editorial

What solar packages does E.ON Next publish?

E.ON Next says its solar systems start from £4,995 for six panels and £6,495 for twelve, and that its packages can be tailored. The packages page, read on 22 October 2026, sets out the two.

PackagePanelsArray sizeStarting pricePanel warranties stated
Small6 Aiko Neostar 3S mono-glass, 485 W each2.91 kWp£4,99530 years manufacturer, 30 years performance
Large12 Aiko Neostar 3S mono-glass, 485 W each5.82 kWp£6,49530 years manufacturer, 30 years performance

Both packages include a hybrid inverter. E.ON also says it sells up to 20 panels depending on the house size and usage, but the page gives no price for larger arrays. The pages read carry no "as at" date for these prices; a footnote refers to the Ofgem price cap from 1 October 2026. Treat them as the prices displayed on 22 October 2026, and expect them to change.

What do the starting prices assume?

E.ON's footnote says the six-panel price is based on an on-roof package, a single elevation of scaffold, single-phase electrics and "no complexities", with installing above a conservatory and digging trenches for electrics given as examples. Ask the quote to show what a second scaffold elevation, three-phase electrics, trenching or other extras would add. E.ON's installation page, for instance, says bird deterrents cost a small additional amount and are discussed after the quote.

How does E.ON Next's installation process work?

E.ON describes four steps: get an online quote; choose a system, with E.ON recommending the number of panels; get a custom design for your home; and get it installed, choosing a date once the grid has approved the connection. Its buy page adds a 3D design of the home and panels, scaffolding around the house, and installation taking as little as one to two days.

E.ON also refers to an initial solar PV survey, at which it says it will tell you how long the job should take. The order matters. E.ON's FAQ says it can offer an installation date only when the network operator (DNO) application has been completed and a smart meter and isolator are installed, and that dates can stretch at busy times of year. Its installation page says E.ON handles grid connection applications from quote to commissioning, that a small system on a single roof can be done in a day though most take two, and that scaffolding goes up a couple of days beforehand and comes down a few days after.

For the national picture, the comparison of energy suppliers that install solar sets E.ON beside the others, and the Octopus Energy guide and British Gas guide cover two of them in the same format.

Who carries out the work?

E.ON says it uses installation partners in some areas of the country as well as its own internal installers. It says all installers go through technical, safety and quality training and that it audits installations frequently, and its solar page says it uses MCS certified installers. Its finance wording names E.ON Energy Installation Services Limited, and its export page refers to installations by E.ON Installation Services. Ask the quote who will be on your roof, and see the MCS certificate guide for the document that records the result.

Which warranties does E.ON Next state?

For both packages E.ON lists a 30-year panel manufacturer warranty and a 30-year panel performance warranty. A 2-year workmanship warranty appears in E.ON's support section, but in a list whose heading refers to its storage installations, so ask what workmanship cover a panels-only order carries and get the answer in writing.

What finance and payment terms does E.ON Next publish?

OptionWhat E.ON says
Pay in fullNo credit check is required.
Three instalmentsA 25% deposit up front, 50% when materials are ordered and 25% on completion.
0% APR financeUp to 3 years on the solar page, up to 2 years on the cost and payment guide. That guide's criteria include a minimum age of 21, being a named owner with at least 3 years of address history and a minimum individual income of £12,000.
7.9% APR financeFor 5 or 10 years. E.ON's representative example is a £8,195 purchase with a £2,048.75 deposit and 120 monthly payments of £73.37, with £10,853.15 as the total amount payable.

Because the pages disagree on the length of the 0% period, confirm it in writing. E.ON Energy Installation Services Limited says it is a credit broker, not a lender. HomeServe Finance Limited acts as the lender, and any credit is subject to status, affordability and a credit check.

Which export options does E.ON Next list?

E.ON's SEG page lists tariffs whose rates change, so this guide links to it rather than repeating them. The conditions differ. Next Export Premium v3 requires a renewable system installed by E.ON Energy Installation Services Ltd. Next Export Exclusive v3 requires an E.ON Next import tariff, excluding time-of-use tariffs. Next Flex Export v1 is open to customers with a renewable generation system up to 5 MW. The page says a smart export meter and consent for half-hourly consumption data are required, and that the installation must be MCS certified or have Flexi-Orb certification.

How do you compare E.ON's prices with DESNZ cost data?

Divide each starting price by the array's capacity. For the small package, £4,995 over 2.91 kWp is about £1,716 per kWp. For the large package, £6,495 over 5.82 kWp is about £1,116. These are derived figures for starting prices on a base specification, and the gap largely reflects fixed costs spread across more panels, so they are a way to check a quote, not a rate to expect.

DESNZ's solar cost data covers England, Scotland and Wales, was last updated on 28 May 2026 with 2025-2026 figures, and is taken from the MCS installation database. It reports cost per kW on two bases, declared net capacity and total installed capacity, and says averages on the installed-capacity basis are typically 6 to 12 per cent lower. E.ON's kWp figures are panel capacity, so they match the installed-capacity series. The cost guide sets out DESNZ's 2025/26 medians by size band; compare your written quote against the band for your array, not the headline. You can send an enquiry through this site's quote form to gather quotes to compare.

What should an E.ON quote confirm?

  • The package, panel count and array size in kWp, so you can work out the price per kWp.
  • How many scaffold elevations, which electrical phase, and whether trenching or other extras are included.
  • Whether E.ON's own installers or an installation partner will do the work.
  • The workmanship cover for a panels-only order, and how long it lasts.
  • The finance product, its APR, term and total payable, or the instalment dates if paying in stages.
  • Which SEG tariff you would be eligible for, and what evidence E.ON wants.

Sources

Common questions

What roof does E.ON Next say suits solar panels?

E.ON says a south, east or west-facing roof suits, that it does not normally recommend north-facing roofs, and that the pitch should be between 20° and 50°. It says it inspects the roof as part of the process to check that it is in good condition.

Does E.ON Next offer bird guards?

Yes. E.ON says it offers bird deterrents for a small additional cost, to be discussed with a sales consultant after you have received your quote.

Can I take export payments from a different supplier?

E.ON's FAQ says yes: you can have different suppliers for your electricity supply and your export payments. Its own tariffs set separate eligibility conditions, so check them against your installation and import tariff first.

Does the E.ON price include scaffolding?

E.ON's cost guide says the price in your quote includes everything, from scaffolding to inverters and panels. The starting price, however, assumes a single elevation of scaffold, so confirm in the quote how many elevations your roof needs.

Get an installation quote

By submitting you agree to our privacy policy. We never sell your details.

Get a quote
Get a quote