British Gas solar panels: what British Gas offers and how installation works

Updated 23 October 2026 · SEO Dons Editorial

Who sells and fits British Gas solar panels?

British Gas's solar page, read on 22 October 2026, introduces the offer as "Solar panel installation from our friends at Hive". A footnote refers to "an independent installer", and Hive's own FAQ is direct: Hive "doesn't provide or install solar panels and other equipment" and introduces buyers to one of three named installers "depending on where you live".

Hive's solar page names Glow Green and Infinity Renewables Group, plus Greener Energy Group in Scotland. A Hive blog article updated on 27 May 2026 names two different firms, Effective Energy Group Ltd and Forster Roofing Services Ltd. The pages do not agree, so ask in writing which company will contract with you. Hive says it is not responsible for the installations and that you must judge an installer's suitability.

What does the offer include?

British Gas lists a ten-year warranty, installation by partners and control through the Hive app. Hive's FAQ describes the basic system:

  • eight 470 W panels, with survey and installation;
  • scaffolding covering "only 2 storeys and 1 face";
  • fitting to concrete tiles, "not slate", with single-phase electrics and "no complexities";
  • a Hive hub and bridge to connect the system to the app.

A slate roof, a taller house, a three-phase supply or extra work fall outside the basis Hive gives for its figure. The footnote to British Gas's discount offer also excludes "structural works, roof repairs, non-standard scaffolding/installations".

What are the steps from enquiry to switch-on?

British Gas's page gives four steps:

  1. Register interest. Installation partners "will be in touch to find out more about your home".
  2. Survey. An "in-person or online survey", then a price.
  3. Installation. The installer fits the system "on a date that suits you".
  4. App. The installer shows you how to use the Hive app.

Hive's FAQ gives the only timings: an average of 30 days from sale to installation for its solar and battery customers in England, and an installation that usually takes a day. These describe past customers, so ask for dates in writing.

How can you pay, and what does the finance example show?

British Gas lists paying in full once installed, a monthly "solar subscription" and a membership discount. Hive's page adds a fixed-rate loan from Zopa Bank. Hive describes the monthly route as "no upfront payment, followed by monthly payments", subject to eligibility, credit and terms.

The representative example shows the build-up: each instalment is a loan repayment plus a monitoring and maintenance fee, and the total repayable includes interest and that fee. Sunsave UK Limited is described as a credit broker, not a lender. Compare the monthly route with a cash price on the total repayable.

The only dated offer is a discount of £750 whose footnote says "Ends 27/7/26". It had ended when this guide was checked, although the footnote remained on the page.

What price does the supplier publish, and does it carry a date?

British Gas's page shows one "from" price for an 8-panel system. Hive's solar page shows a different "from" price for 8 panels, and the Hive blog article gives another average for a three-bedroom house. None carries a date, so this guide does not repeat them.

Hive says its figure rests on "typical pricing for installations in England & Wales by independent installers" and may vary in Scotland or with your home. The only October 2026 date on its page belongs to a savings estimate, not to the price.

The panel size is stated, so the arithmetic still works. Eight 470 W panels are 3.76 kW. Divide whatever a written quote gives for that size by 3.76 to get a price per kilowatt for the cost guide comparison below.

Do you need to tell British Gas you have solar panels?

Two notifications are involved. The first goes to your network operator (DNO). MCS's consumer page says you must register a home system with the DNO and that in some cases the installer does it. MCS's installer guidance sets the timing by size: under G98, up to 16 amps per phase, within 28 days of commissioning; above that, G99 needs permission to connect first.

The second goes to whoever pays for exports, a Smart Export Guarantee (SEG) licensee of your choice. Ofgem advises generators to shop around. British Gas's SEG page says you do not need a British Gas import tariff to apply, and that the tariff you join depends on whether it supplies your electricity and on your system capacity. It asks for an MCS certificate, proof of grid connection from your DNO and a smart meter recording export every 30 minutes, and says account set-up can take up to 4 weeks.

The export MPAN, the meter number for exports, is "linked to the electricity you export to the grid", and for a first-time applicant British Gas will "create and register" it. The export MPAN guide gives the general picture; rates are on British Gas's SEG page and not repeated here. British Gas says it pays quarterly, within 28 days of receiving your latest export reading.

So British Gas needs to know if you want it to pay for exports, or want Hive Solar Saver. That offer is for quotes accepted from 22 May 2024, runs for 12 months and "can be removed at any time".

How do you compare the offer with DESNZ cost data?

Convert any quote to a price per kilowatt: panels multiplied by wattage gives kilowatts, and price divided by kilowatts gives the rate. DESNZ publishes small-scale solar PV costs per kilowatt on two bases, declared net capacity (DNC) and total installed capacity (TIC), and says TIC-based costs are "typically 6 - 12% lower". Summed panel wattage sits closest to installed capacity, so use the TIC series. The data were last updated on 28 May 2026 (2025-2026), cover England, Scotland and Wales, and come from the MCS Installation Database.

Three checks keep the comparison fair:

  • Battery. Dividing a bundled price by panel kilowatts overstates the cost of the panels.
  • Size band. DESNZ's own example is a system of 3.9 kW DNC and 4.1 kW TIC that lands in different bands.
  • VAT. Hive says solar and batteries in homes carry zero-rate VAT. GOV.UK gives the zero rate to 31 March 2027 and 5% from 1 April 2027.

The cost guide sets out the DESNZ 2025/26 medians by size band. Put a Hive-introduced quote beside others using the overview of energy suppliers that install solar, the EDF guide and the step-by-step guide, or send an enquiry through this site's quote form.

Sources

Common questions

Can flat owners or tenants use the British Gas route?

Hive's FAQ says solar suits a house with a standard (not flat) roof, and British Gas's discount terms refer to residential customers and homeowners, subject to property suitability and a survey. Ask the installer about your property before you accept a survey.

Who stands behind the ten-year warranty?

British Gas's page says "10-year warranty" and Hive's price breakdown calls it a "10-year manufacturer warranty". Hive says the installers handle purchase and installation. Ask for the warranty documents before you sign; the MCS certificate guide explains the paperwork a certified installation produces.

Can I join Hive Solar Saver if I already have panels?

British Gas's Solar Saver FAQ says the offer is only available to customers who bought solar or a battery from Hive from 22 May 2024. Panels fitted earlier, or bought elsewhere, fall outside that wording. Check the current terms on the Solar Saver page.

Is the offer available in Scotland?

Hive's solar page says it has teamed up with Greener Energy Group in Scotland and that pricing may vary there. Ask the installer named for your postcode what applies to your address.