EDF solar panels: what EDF and Contact Solar offer and how installation works
Updated 23 October 2026 · SEO Dons Editorial
Who sells and installs EDF solar panels?
EDF sells home solar on its own site and names Contact Solar as its installer; its solar-panels page calls Contact Solar "our installer". EDF's news release of 21 February 2024 says EDF "has acquired Chorley-based solar panel and battery installer, Contact Solar", and that Contact Solar's "network of qualified, local installers across the country will work with EDF to deliver residential installs".
The two firms word coverage differently. EDF says it can install "across England and Wales and some areas of Scotland", while Contact Solar's site says it provides "coverage across England, Wales & mainland Scotland". Check your postcode with the firm that will contract with you.
What does EDF's offer cover?
EDF's pages describe a pitched-roof service: "You'll need a diagonal roof as we cannot offer solar panels for flat roofs", and an average system "will typically take up around 15-20m2 of roof area". The main solar page names 480 W LONGi panels with a 30-year product warranty and a 30-year performance warranty, subject to LONGi's terms, plus 10-year warranties on batteries and inverters. The other page lists a typical three-bedroom system as nine panels with installation, scaffolding, surveys and a monitoring app.
EDF ties some offers to its tariffs. Its pages describe a "bill to nil" outcome for buyers of solar and a battery who join an EDF import tariff, with assumptions in footnotes based on the October 2026 price cap. This guide does not assess those savings claims.
What price does EDF publish, and from when?
EDF shows a starting point on two pages, and neither carries a date beside the price, so this guide does not repeat the figures. The footnotes on their basis are more useful:
| EDF page | Basis stated for the price | Date beside the price |
|---|---|---|
| Solar page ("prices starting from") | "A minimum price" for a 1.92 kW system of four panels with a 3.6 kW inverter, standard installation in England (excluding Greater London), no battery, with a scaffolding allowance | None |
| Solar-panels page | An estimate for "a typical 3-bedroom house": nine panels, installation, scaffolding, surveys and warranties | None |
A four-panel minimum and a nine-panel home are different jobs, and neither is a price for your roof. EDF adds that final costs depend on property type, roof condition, system size, add-ons, scaffolding beyond its allowance, access and region.
The only dates are in savings footnotes and a VAT note. EDF says the 0% VAT relief "is temporary and is due to expire on 31 March 2027"; GOV.UK's VAT notice gives the zero rate for 1 May 2023 to 31 March 2027 and 5% from 1 April 2027.
What are the steps from enquiry to installation?
- Enquiry and remote survey. EDF's FAQ says an enquiry brings a call back for a remote survey, after which a system can be fitted "within as little as four weeks". That is a best case, not a commitment.
- Quote. Contact Solar says its quote form produces an email with a "guideline price", then an adviser discusses a bespoke quotation and emails an updated one.
- Order. A sales consultant emails a confirmation with a signature request. A contract exists only once the order is confirmed.
- Survey. A visit is agreed to take measurements, followed by a call. Any change to the quotation is issued then.
- Scaffold and installation. The scaffold goes up, then a date is agreed. The terms say the aim is five business days, with the scaffold staying 7-10 days afterwards.
- Payment and paperwork. Payment is requested at completion, and the handover documents follow once payment and signed paperwork are in.
EDF mentions a remote survey and Contact Solar a survey visit, so ask which happen on your job and when the price can change.
What do the quote, payment and cancellation terms say?
- A quotation is valid for 30 days, and a contract exists only once the order is confirmed.
- Work does not typically start in the "cooling off" (cancellation) period unless you return an Express Request Form. If you then cancel, you pay for work done and materials bought.
- After the cooling-off period, cancelling a surveyed order incurs a survey fee. The amount is in the terms, which carry no date.
- Planning permission is the customer's responsibility; the permitted development guide covers the England rules that changed on 27 August 2026.
- Workmanship cover is the HIES two-year workmanship warranty, with manufacturers' warranties for materials after year one. Registering them is the customer's job.
Deposits are where the pages disagree. EDF's pages say "No deposit needed" and Contact Solar's home page says "No Deposit - Payment due on completion", yet the quote terms say "Deposits will be necessary for all offers to secure your booking". The terms carry no date and may describe a different offer, so get the deposit position in writing before you accept.
What do EDF and Contact Solar say about accreditation?
EDF's page says Contact Solar is "certified by the Microgeneration Certifications Scheme (MCS)" and "TrustMark Certified". Contact Solar's quote terms say it is a member of HIES and that installation follows "the relevant MCS Standard". MCS advises checking an installer's certification through its Find an Installer search "as you get a quote, before you sign your contract, and before the installation starts".
People also search for Contact Solar reviews. This guide does not summarise or score reviews; it sets out what EDF and Contact Solar publish and how to verify certification yourself. The MCS certificate guide explains the certificate.
How do export payments and the export meter number work?
Contact Solar's export page says it notifies the network operator when the system is commissioned, and that if you apply for the Smart Export Guarantee your energy provider "should contact the DNO to request an export Meter Point Administration Number (MPAN)". It says the DNO confirmation letter "can take up to 8 weeks" to arrive and that applications need your MCS certificate and that letter. The quote terms add that organising the export application "rests with you".
EDF's SEG page says you must complete an application before you can access a SEG tariff and asks for an MCS certificate copy, a bill if EDF does not already supply you, your details and a photo of the export meter reading. Rates change, so read them on EDF's SEG page. The export MPAN guide covers the number in general.
How do you compare the EDF offer with DESNZ data?
Start with size, because DESNZ groups costs by system size. EDF's footnote gives 1.92 kW for four panels, which is 480 W each. As an illustration only, nine panels of 480 W would be 4.32 kW. DESNZ gives the 0-4 kW and 4-10 kW groups as examples, so a four-panel minimum and a typical-home system fall in different bands. Divide any written quote by its kilowatts and compare it with the median for its band on the cost guide.
Use DESNZ's total installed capacity (TIC) basis for panel-based kilowatts: DESNZ says costs on that basis are "typically 6 - 12% lower" than on declared net capacity. The statistics were last updated on 28 May 2026 and draw on the MCS Installation Database. Check what each quote includes, such as a battery, the scaffolding allowance, VAT and region.
For other routes see the overview of energy suppliers that install solar, the British Gas guide and the OVO guide. You can also send an enquiry through this site's quote form.
Sources
- EDF, solar, checked 22 October 2026.
- EDF, solar panels, checked 22 October 2026.
- EDF, Smart Export Guarantee tariffs, checked 22 October 2026.
- EDF, news release on the Contact Solar acquisition (posted 21 February 2024), checked 22 October 2026.
- Contact Solar, home page, checked 22 October 2026.
- Contact Solar, what happens next, checked 22 October 2026.
- Contact Solar, the export tariff, checked 22 October 2026.
- Contact Solar, quote terms and conditions (no date shown), checked 22 October 2026.
- MCS, solar panels, checked 22 October 2026.
- DESNZ, solar PV cost data (last updated 28 May 2026), checked 22 October 2026.
- HMRC, VAT Notice 708/6, checked 22 October 2026.
- legislation.gov.uk, SI 2026/896, checked 22 October 2026.
Common questions
Does EDF fit solar on flat roofs?
EDF's solar-panels page says you need a diagonal roof because it cannot offer solar panels for flat roofs, and gives the best pitch as 30 to 40 degrees. If your home has a flat roof, ask before you book a survey.
Do I need planning permission for EDF's system?
EDF's FAQ says that for most homes you do not, with exceptions for listed buildings, conservation areas and national parks, where you should check with your local planning office. Contact Solar's terms put the responsibility for permissions on the customer.
Can I use an EDF export tariff with panels fitted by someone else?
EDF's SEG page lists tariffs for people who buy solar or a battery from EDF, and two variable tariffs described as exclusive to EDF electricity customers or available to anyone. Read the current eligibility terms on the page before applying.
Who gives the workmanship warranty?
Contact Solar's quote terms refer to a HIES two-year workmanship warranty and say manufacturers' warranties cover materials after the first year. Ask for the warranty documents before you sign.