Bought a house with solar panels? What to do in the first month
Updated 23 October 2026 · SEO Dons Editorial
Do you own the panels, and are they on the Feed-in Tariff?
Start with ownership, because it decides who receives any Feed-in Tariff (FIT) payments. Ofgem says the owner of an installation can differ from the owner of the property. That is third-party ownership, and most such arrangements follow the "rent-a-roof" model. Ofgem adds that these installations may be sold between companies, and the change of owner may not be communicated to the homeowner.
Ofgem can tell a new occupier whether the installation is registered to receive FIT support, who the FIT generator is and which licensee pays them. You send an Ownership Register Query to Ofgem's Central FIT Register team and must give documentary proof of identity before it releases anything. Checks to make before exchange are in the buying and selling checklist; this page picks up after completion. If you are wondering whether the panels added to what you paid, do solar panels add value to a house? compares the UK studies.
Which documents should you collect first?
| Document | Why it matters | If it is missing |
|---|---|---|
| MCS certificate | GOV.UK says the SEG needs an MCS-certified installation (or an accredited equivalent), and MCS says a supplier might ask for the certificate. | Ask the installer first. MCS sends copies only to the current owner, with proof you live at the address, and only where the installer is no longer certified or trading. See the MCS certificate guide. |
| Network operator confirmation (G98 acknowledgement or G99 approval) | SSEN says most suppliers want a "DNO Response" email. Electricity North West says its approval letter can go to the supplier. | Ask the installer. National Grid Electricity Distribution has a page for requesting a DNO acceptance letter. |
| Export MPAN and meter details | Suppliers and operators may ask for them when you register for export payments. | See the export MPAN guide. |
| Warranty papers and device serial numbers | Serial numbers identify the equipment and the installer. | Enphase says its support team can match serial numbers to a system and installer. |
If the seller cannot find everything, the solar handover pack checklist shows who issues each document and how to get a copy.
How do you take over Feed-in Tariff payments or start export payments?
If the installation is on the FIT. The scheme closed to new applicants from 1 April 2019, but MCS says people already receiving payments can continue for the duration of their contract. Ofgem says the new owner of an MCS-FIT installation, meaning solar PV at or below 50 kW, should contact the licensee it is registered with, which updates the generator details on the Central FIT Register. Only the installation owner, or someone assigned the payment rights, can raise a dispute, so get the change registered. Payments rest on meter readings you submit, as solar meters explained sets out.
If it is not on the FIT. The route is the Smart Export Guarantee (SEG). GOV.UK says you apply directly to a SEG supplier, which need not be your energy supplier, and the Energy Saving Trust (EST) says you need a registered smart meter that records export. MCS describes the steps: choose a supplier, pick a tariff and apply online with your smart meter data and MCS certificate. Rates are not compared here.
If the FIT is paying export. Ofgem says you must opt out of FIT export payments before registering for the SEG, and the EST says FIT generation payments can continue.
If there is no certificate. Where an MCS installer finished work but never issued one, MCS says it cannot help raise a new certificate. A regulated SEG tariff needs MCS certification, but MCS says energy companies can offer non-SEG tariffs to any customer, so ask each supplier what evidence it accepts.
How do you take over the monitoring account and warranties?
Monitoring portals record a named system owner. Fronius says the account that first registers a system is stored as the owner and can name a new owner in settings, and that someone without owner rights should contact the owner, usually the installer. Solis says an owner change needs either confirmation from the registered owner's email or proof of ownership, such as a purchase deed or sales contract; its article was modified on 8 October 2026. Other makers differ, so identify the inverter brand first.
Warranty terms are set by each manufacturer and installer, so read the documents rather than assume they pass to you. The EST says most inverters carry warranties of five years as a minimum, often extendable by up to 15 years. MCS notes that many lenders and insurance companies require MCS for renewable technology at a policyholder's address, so tell your insurer; see solar panels and home insurance.
How do you check the system is generating as expected?
Take a dated photograph of the generation meter on day one, then compare a full year of output with an independent estimate. PVGIS, the European Commission's solar tool, gives one: for 1 kWp at 52.486 N, 1.89 W (central Birmingham), tilted 35 degrees, facing south, with 14% system losses, it returns 968.06 kWh a year. A 4 kWp array on a roof like that would be expected to make about 3,872 kWh (4 x 968.06), before shading and other site differences. Enter your own location, slope and direction for a fair comparison.
The EST says some inverters have online monitoring and can email a warning if the system fails, and that the installer should leave written details of the main inverter fault signals. A persistent shortfall is worth a visit from a competent installer. The EST also says an inverter needs replacing after around 12 years; the cost guide explains what a quote for repair or replacement should itemise.
Sources
- Feed-in Tariffs (FIT): generators, Ofgem, checked 22 October 2026.
- Feed-in Tariffs: dispute resolution guidance, Ofgem, checked 22 October 2026.
- MCS certificate queries, MCS, checked 22 October 2026.
- Why MCS matters: a response to SEG confusion, MCS (Statement of 13 September 2023), checked 22 October 2026.
- Smart Export Guarantee (consumer guide), MCS, checked 22 October 2026.
- Smart Export Guarantee (SEG): earn money for exporting renewable electricity, GOV.UK (DESNZ and Ofgem) (Published 1 January 2020), checked 22 October 2026.
- How to register energy devices in homes or small businesses, GOV.UK (DESNZ) (Published 31 March 2021), checked 22 October 2026.
- Smart Export Guarantee explained, Energy Saving Trust (Last updated 20 October 2026), checked 22 October 2026.
- Solar panels: costs, savings and benefits, Energy Saving Trust (Last updated 1 October 2026), checked 22 October 2026.
- Installation of up to 3.68kW per phase at one property, SSEN, checked 22 October 2026.
- Generation G99, Electricity North West, checked 22 October 2026.
- Homes and small businesses, National Grid Electricity Distribution, checked 22 October 2026.
- Enphase Energy System warranties, Enphase, checked 22 October 2026.
- Request a change of system owner in SolisCloud, Solis (Modified 8 October 2026), checked 22 October 2026.
- Solar.web FAQ: change of owner, Fronius, checked 22 October 2026.
- PVGIS PVcalc output, 52.486 N 1.89 W, 1 kWp, 35 degrees, due south, European Commission Joint Research Centre, checked 22 October 2026.
Common questions
Does the Feed-in Tariff transfer with the house?
For a household installation Ofgem says the new owner contacts the licensee it is registered with, which updates the generator details. Where the panels belong to a third party under a rent-a-roof arrangement, the FIT generator is the installation owner rather than the homeowner, so the payments do not follow the house.
Who can complain if the change of ownership is not registered?
Ofgem says only the installation owner, or someone assigned the payment rights, can raise a dispute. If a change of ownership is not processed, follow the licensee's complaint process first. After eight weeks without resolution you can refer it to the Energy Ombudsman.
Can I get SEG payments if the seller never registered?
Possibly. GOV.UK says you apply directly to a SEG supplier, so the seller's registration is not a precondition, but the supplier will want MCS certification and a meter that records export. If a certificate was never issued, MCS cannot raise a new one, so ask suppliers whether a non-SEG export tariff is open to you.
Do I need to tell the network operator I bought the house?
GOV.UK makes the device owner responsible for ensuring the operator received the installation's notification. The operator pages checked for this guide describe no change-of-owner step, so ask the operator if the MPAN or any approval letter is in the seller's name.