Can you install solar panels yourself in the UK? The legal checklist
Updated 10 November 2026 · SEO Dons Editorial
Is it legal to install solar panels yourself?
The rules apply to whoever does the work. Regulation 12 of the Building Regulations applies to a person who intends to carry out building work, and requires a building notice or application unless the work falls in the exemption for registered installers, which only covers work done by a registered person. A householder fitting their own roof solar therefore goes through building control, and must also meet the electricity safety regulations and the network operator's connection process.
Two results follow. The system is inspected rather than self-certified (in Scotland, installers are told to check with the local authority building standards service about a building warrant before starting), and it cannot be MCS certified.
If you would rather have a system fitted for you, our guide to solar panel installation explains the process and the costs.
Having it installed instead? How solar panels are installed walks through a registered installer's job from scaffold to handover, and the solar handover pack checklist lists the sign-off papers you should receive. To have installers price the job, use the quote form.
What does the legal checklist look like, step by step?
| Step | What the rule requires | What you end up with |
|---|---|---|
| 1. Tell building control | The person doing the work gives a building notice or an application, as regulation 12 sets out. Part P work such as a new circuit is notifiable in England. | Inspections and a completion certificate under regulation 17 |
| 2. Roof structure | Requirement A1 says the building must carry its loads safely. East Herts says the roof's ability to take the extra wind, snow and static load must be checked by a qualified structural engineer. | A written structural check for building control |
| 3. Electrical work | Requirement P1 covers design and installation, and all electrical installation work must follow building regulations. A source connected in parallel with the network that is part of a low voltage installation must comply with the British Standard Requirements. | Completion certificate and test records |
| 4. Network operator | Up to 16 amps per phase, read from the inverter's continuous rating: notify within 28 days of commissioning. Above that: apply and get authorisation before the work. | The operator's confirmation |
| 5. Roof work | HSE says all roof work is highly dangerous, and that sloping roofs require scaffolding to stop people or materials falling from the edge. | Scaffold or edge protection |
| 6. Export payments | The Smart Export Guarantee (SEG) needs an installation and installer certified through MCS or an equivalent scheme. | None for a self-installed system |
The three building requirements are explained in solar panels and building regulations.
Why can a self-installed system not earn export payments?
Because the payment route is tied to certification. GOV.UK says a SEG applicant must show that the installation and installer are certified through MCS or an equivalent scheme, and must have a meter that gives half-hourly export readings. MCS requires the installation to be commissioned by an MCS certified installer using MCS certified products, and a homeowner who commissions their own system fails the first test.
The older Feed-in Tariff is not an alternative, as Ofgem says it closed to new applicants from 1 April 2019. MCS is clear that a certificate is not a legal requirement, so an uncertified system can be lawful. It earns nothing for exports. The MCS certificate guide covers what the certificate records.
What does the network operator have to be told?
Great Britain's G98 route covers installations up to 16 amps per phase, which Electricity North West gives as 3.68 kW single phase and 11.04 kW three phase. SSEN says the installer must use certified inverters and components, and that the G98 form must be submitted within 28 days of commissioning, with an inverter type test certificate whose rating matches the schematic. Anything larger is a G99 application, which DESNZ says must be submitted before installing.
The statute is stricter on timing than the forms. Regulation 22 of the Electricity Safety, Quality and Continuity Regulations 2002 lets small sources skip some duties if the output does not exceed 16 amperes per phase, the source disconnects itself when the distributor's supply is cut, and the person installing ensures the distributor is advised before, or at the time of, commissioning. Notifying on the day of commissioning satisfies both readings. The G98 vs G99 guide explains why a battery can tip a system into G99.
What are the safety rules for working on a roof?
HSE says almost one in five deaths in construction work involve roof work, and that all roofs should be treated as fragile until a competent person has confirmed they are not. The Work at Height Regulations 2005 apply to employers and to people who control work at height, but the hazard is the same for anyone. HSE also advises using ladders and stepladders only for light work of short duration, a maximum of 30 minutes at a time, and not for strenuous or heavy tasks. Solar panels are large and awkward to carry, and HSE's guidance for sloping roofs points to scaffolding, with ladders only for tasks measured in minutes. See scaffolding for solar panel installation.
Can a registered electrician do just the electrical part?
A registered person's certificate covers the work that person carries out. Regulation 20 applies only to the extent that the building work consists of Schedule 3 work carried out by a person registered for it, and the certificate is given by the person carrying out the work. The roof structure and fixings still need to be covered, so ask building control how they will be inspected before work starts.
What if panels were fitted without telling anyone?
GOV.UK warns that the person doing the work could be prosecuted and fined, and that without approval you will not have the certificates of compliance you may need when you sell. In England, regulation 18 allows the owner to apply in writing for a regularisation certificate for unauthorised work carried out on or after 11 November 1985. The grid notification is still needed.
What about plug-in solar?
Plug-in solar is a separate, legal route. The regulations that came into force on 27 August 2026 define a plug-in microgenerator as a solar source with a maximum rated AC output of 800 watts, connected by a standard plug and socket, and say it must not be installed or operated unless it complies with the Plug-in Solar Device Interim Product Specification. It is a different product from a roof array with its own rules, so the roof checklist above is not the guide to it.
For a roof system, any DIY saving has to be weighed against no export income, building control inspections and scaffold. The cost guide shows what moves the price of a professional installation, and the services overview lists the roof types. Readers who would rather compare installers can send an enquiry through the form on this site.
Sources
- Building Regulations 2010, regulation 12, legislation.gov.uk, checked 22 October 2026
- Building Regulations 2010, regulation 17, legislation.gov.uk, checked 22 October 2026
- Building Regulations 2010, regulation 18, legislation.gov.uk, checked 22 October 2026
- Building Regulations 2010, regulation 20, legislation.gov.uk, checked 22 October 2026
- Building Regulations 2010, Schedule 1, legislation.gov.uk, checked 22 October 2026
- Electricity Safety, Quality and Continuity Regulations 2002, regulation 22, legislation.gov.uk, checked 22 October 2026
- Plugs and Sockets etc. (Safety) Regulations 1994 and ESQCR 2002 (Amendment) Regulations 2026, legislation.gov.uk, made 16 July 2026, checked 22 October 2026
- Building regulations approval, GOV.UK, checked 22 October 2026
- How to register energy devices in homes or small businesses, GOV.UK (DESNZ), published 31 March 2021, checked 22 October 2026
- Smart Export Guarantee (SEG): earn money for exporting the renewable electricity you have generated, GOV.UK (DESNZ and Ofgem), published 1 January 2020, checked 22 October 2026
- Feed-in Tariffs (FIT): generators, Ofgem, checked 22 October 2026
- MCS certificate queries, MCS, checked 22 October 2026
- Installation of up to 3.68kW per phase at one property, SSEN, checked 22 October 2026
- G98 micro-generation and storage connections, Electricity North West, checked 22 October 2026
- Roof work, HSE, updated 5 June 2026, checked 22 October 2026
- The law (work at height), HSE, updated 29 October 2024, checked 22 October 2026
- Introduction to working at height safely, HSE, updated 1 March 2021, checked 22 October 2026
- Solar panels, East Hertfordshire District Council, checked 22 October 2026
- TA6 (6th edition) explanatory notes, The Law Society, 13 October 2025, checked 22 October 2026
- Buying a house with solar panels, Energy Saving Trust, 6 October 2026, checked 22 October 2026
Common questions
Do I need an electrician's certificate if I fit the panels myself?
The Law Society says that from 1 January 2005 all electrical installation work must follow building regulations. In England a new circuit is notifiable, so building control inspects the work and gives a completion certificate when satisfied. The Law Society's TA6 sale form asks the seller to attach any electrical installation certificate they hold.
Can I get Smart Export Guarantee payments on a DIY system?
GOV.UK says you need to show that your installation and installer are certified through MCS or an equivalent scheme. MCS adds that a certificate requires commissioning by an MCS certified installer. A system you commission yourself cannot meet that test.
Will home insurance cover a system I fitted myself?
That depends on the policy. The Energy Saving Trust advises checking your insurance documents to see if solar panels are covered, and speaking to your insurer if not. Tell the insurer how the system was installed and what certificates exist.