Do solar panels need building regulations approval?

Updated 23 October 2026 · SEO Dons Editorial

Which building regulations apply to a home solar installation?

Councils are consistent on the headline. Milton Keynes City Council says a solar PV installation fitted to your roof needs Building Regulations approval, and East Hertfordshire District Council says all solar panel installations must comply. Three requirements in Schedule 1 of the Building Regulations 2010 do the work.

PartWhat Schedule 1 requiresWhat it means for a roof system
A1, structureThe building must carry its combined dead, imposed and wind loads safely to the ground.Panels, rails and fixings add weight and catch wind. East Herts says the roof must be checked for the additional wind, snow and static load by a qualified structural engineer. New Forest District Council says strengthening may be needed.
B4(2), fire safetyThe roof must adequately resist the spread of fire over the roof and from one building to another, having regard to the use and position of the building.Most relevant where the array forms the roof covering. The evidence is in the fire-risk post.
P1, electrical safetyReasonable provision must be made in the design and installation of electrical installations to protect people from fire or injury.Covers the wiring, isolators and consumer unit connection, for installations in or attached to a dwelling.

Regulation 3 explains why a panel installation is caught. "Building work" includes the material alteration of a building, and an alteration is material if it leaves the building not complying with a relevant requirement where it previously did. Part A and requirement B4 are both relevant requirements. GOV.UK's Approved Documents are the statutory guidance: Document A covers loadings and structural elements including roofs, and Document P explains when notification of work is required.

Is the work certified by the installer's scheme or by building control?

Registered installer. Regulation 12(6) removes the need for a building notice or application where the work is listed in Schedule 3 and done by a person registered for it. Item 15 covers installing in a building a system to produce electricity, heat or cooling by microgeneration or from renewable sources, and GOV.UK lists authorised schemes for microgeneration and renewable technologies. The installer must then, not more than 30 days after completion, give the occupier a copy of the certificate and give building control notice or the certificate.

Not registered. The job goes through building control, which is where a householder fitting their own system ends up (see the DIY legal checklist). In England, regulation 12(6A) requires a building notice or application for Part P work that consists of a new circuit, a consumer unit replacement or alterations to circuits in a special location. A solar inverter's AC supply is ordinarily a new circuit. Milton Keynes says an unregistered installer means a Building Regulations application, with inspections arranged once work starts. Regulation 17 then requires a completion certificate where building control is satisfied, with a specified period of eight weeks from receipt of the notice.

Which certificates should you be given?

DocumentFromWhy it matters
Competent person certificate, or building control completion certificateThe installer's scheme, or the local authorityEvidence, but not conclusive evidence, that the requirements were met. Where the installer is not registered, DESNZ guidance on GOV.UK makes obtaining it the owner's responsibility.
BS 7671 Electrical Installation CertificateThe electricianElectrical work must also comply with the wiring regulations (BS 7671), says the Law Society.
Network operator evidenceThe installer, from the operatorThe owner must make sure the operator has been notified. See G98 vs G99.
MCS certificateAn MCS-certified installerNot a legal requirement, says MCS, but it matters for export payments. See the MCS certificate guide.

What changes for an in-roof system?

An in-roof array replaces part of the roof covering, which puts Part B closer to the centre. Schedule 3 has a competent person entry for replacing roof coverings, but it states that it does not apply to the installation of solar panels, so a roofing scheme's registration is not a solar registration. The two layouts are compared in in-roof vs on-roof panels.

The Building Safety Regulator commissioned 11 large-scale roof fire experiments at HSE's science and research centre to help decide whether Approved Document B volume 1 needs more guidance. The initial findings, published on 22 December 2025, may change as the full report is produced and do not represent government policy.

Do Wales and Scotland follow the same rules?

Wales. The Law Society says building regulations have been different in England and Wales since 31 July 2014, and GOV.WALES publishes its own Approved Documents. A registered installer in Wales should notify the local authority and issue a certificate of compliance, directly or through the scheme operator. Do not assume the England wording of regulation 12(6A) applies.

Scotland. Scotland uses building warrants. West Lothian Council says a warrant is not required for solar or PV panels on the roof of a single or two storey house provided the existing roof can take the additional loading, and is required if the roof needs strengthening. The DESNZ guidance tells Scottish installers to check with the local authority building standards service before starting, and the Technical Handbook treats solar roof panels as part of the roof covering for fire purposes.

Planning is separate. GOV.UK says building regulations approval is different from planning permission and you might need both. Planning limits are in the permitted development guide, and Northern Ireland has its own rules, which this post does not cover.

What if the work was never certified?

GOV.UK says the person doing the work could be prosecuted and fined, building control could make the owner pay to fix faulty work, and without approval you will not have the certificates of compliance you may need to sell. In England, regulation 18 lets the owner of unauthorised work carried out on or after 11 November 1985 apply in writing for a regularisation certificate. Building control may require the work to be laid open for inspection, with tests and samples. The buyer's view is in the buying and selling checklist.

What should you ask an installer to put in writing?

  • Which scheme they are registered with for microgeneration, or whether the job goes through building control.
  • Who has checked the roof structure, and where that is recorded.
  • For in-roof, what the roof covering is and how it meets the fire requirement.
  • Whether the grid route is notify (G98) or apply first (G99), and who submits it.

Readers comparing installers can send an enquiry through the form on this site, and the guide to how much solar panels cost explains what moves the price once these checks are included.

Sources

Common questions

Is a building regulations certificate the same as an MCS certificate?

No. A competent person or completion certificate shows the work met the Building Regulations. An MCS certificate records that a certified installer commissioned the system with certified products, and MCS says it is not a legal requirement. A sale can need both sets of papers.

Who is liable if panels were fitted without the right notification?

GOV.UK says the person doing the work could be prosecuted and fined, and building control could make the owner pay to fix faulty work. In England, older unauthorised work can be put right through a regularisation certificate.

Do leaseholders need anything beyond building regulations?

Often yes. New Forest District Council says a leaseholder may need permission from the landlord, freeholder or management company. That consent is separate from building regulations and from planning permission.