Solar meters explained: generation meters, smart meters and export metering

Updated 23 October 2026 · SEO Dons Editorial

Which meters can a home solar system have?

Three different readings can matter, and they come from different meters.

MeterWhat it countsWhere it matters
Import meterElectricity drawn from the gridEvery home. Elexon describes metering systems as recording the flow of electricity to a site (an import) or from it (an export).
Generation meterEverything the panels produce, before the home uses anyFIT generation payments. Ofgem says a FIT generator must be able to measure generation separately from all other sources.
Export meter, or a smart meter's export readingElectricity sent to the gridSEG payments, and metered FIT export payments.
Inverter display or monitoring appThe inverter's own record of outputUseful for checking performance. The Ofgem and GOV.UK pages checked refer to meters, not inverter displays, when they set out payment rules.

The SEG pays for export only. GOV.UK says you will be paid for every unit you feed back and not for any you use yourself, so the generation total does not set the payment.

Do you need a smart meter for solar panels?

GOV.UK lists the meter under "What you need to apply for a SEG tariff": a meter capable of providing half-hourly export readings, which "would typically be a smart meter". So the requirement attaches to the export payment, not to fitting panels. The wording varies by source. The Energy Saving Trust (EST) and MCS both say a smart meter that records exported electricity, and Ofgem's FIT page says a smart or export meter. Ask the supplier which meters and data it accepts before ordering anything.

Ofgem says a smart meter automatically sends readings to your supplier, and to get one you contact your supplier. The supplier, not the network operator, normally arranges the meter: SP Energy Networks says it does not provide or connect the electricity meter and that this is the supplier's job. In Northern Ireland, NIE Networks says it arranges an import/export meter after the commissioning form if none is fitted.

On readings, Ofgem says generators are entitled to payments based on actual meter readings, even where a supplier offers a different payment model. Tariff rates are not compared here; the grants and funding page summarises the scheme.

Is a separate export meter ever needed?

The sources ask for a capability, half-hourly export readings, rather than a particular box. A smart meter that records export typically meets it, and Ofgem's reference to "a smart or export meter" points to a dedicated export meter as the alternative. Whichever is fitted, the export metering point has its own number, covered in the export MPAN guide.

The choice matters most to FIT homes. Ofgem says "deemed export" payments apply when an installation under 30 kW has no export meter or its export cannot be properly measured. A metered export reading replaces the estimate.

What if a supplier asks for meter readings?

Under the SEG, MCS describes applying online with the supplier's form and including your smart meter data and your MCS certificate. Under the FIT, readings come from you: Ofgem says FIT generators provide meter readings to their licensee, and payments are made at least quarterly on those readings.

A dated photograph of each display, taken when you submit, is a sensible habit. If a supplier asks for a meter serial number, the MCS certificate may hold it: MCS lists meter make, model and serial number among the details it can amend.

I get Feed-in Tariff payments: what changes with meters?

SituationWhat Ofgem says
Replacing or removing a meterTell your FIT licensee when a generation or export meter has been replaced, removed or begins measuring electricity not generated by the accredited installation.
Having a smart meter fittedGeneration payments are not affected. Deemed export payments stop, and you are paid for the export the meter records.
Adding a batteryTell your licensee when battery storage is connected. Payments continue if generation, and export if metered, can still be accurately measured.
Moving export to the SEGYou cannot be paid both for the same electricity. Opt out of FIT export first; the EST says FIT generation payments can continue.

A panels-only system is the simplest metering case. How electricity flows in one is explained in solar panels without a battery.

What should be in place before you ask a supplier for an export tariff?

  • A meter that records export half-hourly, confirmed with the supplier.
  • The MCS certificate, with the meter details and address correct.
  • The installer's G98 or G99 confirmation from the network operator, and the export MPAN if the operator issues one for your size of system.
  • If you receive FIT export payments, the opt-out arranged with your FIT licensee first.

Does a meter swap affect the MCS certificate?

It can. MCS says you may need to amend the certificate if the meter has been changed, and asks for a clear photograph showing the make, model and serial number. It cannot amend meter readings. Contact the original installer first. MCS amends on the installer's behalf only if the installer is no longer MCS certified or no longer trading. The process is in the MCS certificate guide.

Sources

Common questions

Does the SEG pay for everything my panels generate?

No. GOV.UK says the SEG pays for every unit you feed back to the grid and nothing for electricity you use yourself. A generation meter reading therefore does not set the payment.

Who fits the meter that records export?

In Great Britain the supplier arranges meters, according to SP Energy Networks. In Northern Ireland NIE Networks says it arranges an import/export meter after reviewing the commissioning form, if none is already fitted.

Does a battery change which meters I need?

Ofgem says FIT homes must tell their licensee when storage is connected and keep generation, and metered export, measurable separately. For the SEG, the EST says a battery does not stop you applying.

What is a deemed export payment?

Ofgem says deemed export payments apply to FIT installations under 30 kW with no export meter, or where export cannot be properly measured. They are based on a percentage of generation that the Department for Energy Security and Net Zero sets each year.