How does a panels-only system work?
A panels-only system is a grid-connected (also called grid-tied or on-grid) system with nothing in it that stores electricity. MCS describes a home system as several panels connected with other parts, "like an inverter and wiring", and plugged into the home's electrics so the electricity can be used around the house. Whatever the panels make is used by whatever is switched on at that moment, and anything left over leaves the house.
GOV.UK states the export side plainly: anyone generating renewable electricity can feed back into the grid any electricity they don't use. Under the Smart Export Guarantee (SEG) the payment is for every unit fed back, and none for what the household uses itself. When the panels are making less than the house needs, or nothing, the shortfall comes from the grid, just as it did before the panels. The wiring behind this is traced part by part in how solar panels work on a house.
| Moment | What the panels are doing | Where the home's electricity comes from |
|---|---|---|
| Sunny midday, little in use | Making more than the home needs | The panels first. The surplus goes out to the grid. |
| Cloudy afternoon | Still generating, at a lower output | Part panels, part grid. |
| Evening and overnight | Not generating | The grid, as before the panels went on. |
| Power cut | Switched off by the system | Nothing from the panels, and no grid supply either. |
The Energy Saving Trust (EST) says solar cells do not need direct sunlight and can work on cloudy days, so the second row is a reduction, not a stop. It also describes the gap a battery is meant to fill: storage lets you keep solar electricity for the times the panels aren't generating, which reduces how much you import. Without a battery you import in those hours, and the EST says you will typically export more of your unused solar electricity.
What happens to a panels-only system in a power cut?
It stops. SSEN, a network operator, says systems such as solar panels switch off automatically during a power cut to protect the home and the engineers working on the network. Electricity North West gives the same answer, for safety reasons. The EST adds that panels typically cannot power a home in a power cut unless the home is off the grid or the system was installed with additional equipment.
A battery does not change this by itself. SSEN says batteries will usually switch off too, unless they have a backup or island mode function that can power parts of the home. Backup is a design feature to ask about at the start, not something a standard system quietly includes.
Restarting needs no action in most cases. SSEN says panels will usually restart on their own once power returns, and Electricity North West says most start working automatically. One instruction from SSEN is worth knowing: if an outage letter says a temporary generator will be connected, turn the panels off before the planned outage, because panels left on may feed electricity into the generator and stop it working.
Which grid route does a panels-only system follow?
The route depends on the inverter, not on whether there is a battery. G98 is the connect-and-notify route. Electricity North West says it applies to generation installations up to 16 amps per phase, which it gives as single-phase systems up to 3.68 kW and three-phase systems up to 11.04 kW. It also says that where an installation includes an inverter, the rating is assumed to be the inverter's continuous steady state rating, so the inverter figure matters more than the total size of the panels.
Under G98 the installer fits the system first and notifies the network operator afterwards. GOV.UK gives the deadline as within 28 days of installation, and SSEN's own page says within 28 days of commissioning. GOV.UK also puts a responsibility on the owner: it is the owner's job to make sure the network operator has received the notification.
A battery enters this picture when it is part of the design. For installations that fall under apply-to-connect (G99), GOV.UK describes a fast-track G99 form, A1-2, for fully type tested integrated microgeneration and storage installations, and it must go in before installation. The full rules, and why the order of events matters, are in G98 vs G99 explained.
What else can use the surplus if there is no battery?
A diverter is the usual alternative. The EST lists PV diverters alongside batteries as equipment that lets you use more of what the panels generate, in the diverter's case by sending it to an immersion heater. Its energy storage guide describes the same idea: heating water with spare solar electricity through a diverter. The result is hot water in the cylinder instead of a charged battery.
Which diverter suits which cylinder, and how they are wired in, is covered in the diverter guide.
Do you need a battery to be paid for exported electricity?
MCS lists three SEG eligibility conditions: solar panels (or small wind, or micro CHP) installed at the home, a smart meter that records exported electricity, and an installation by an MCS certified installer using certified products. Storage is not on that list. GOV.UK likewise asks for a meter capable of half-hourly export readings, which would typically be a smart meter.
A battery can still matter for a particular tariff. The EST notes that some suppliers offer solar-specific tariffs aimed at homes with panels and battery storage. That is a feature of those products, not a condition of the scheme. This page does not compare export rates; the export MPAN guide covers the paperwork that sits behind any export tariff.
What should the inverter allow if a battery might follow later?
The battery decision does not have to be made at the survey, but the inverter choice can make a later battery simpler or harder. SMA, an inverter manufacturer, says in the FAQ for one of its hybrid models that the unit can be operated as a pure PV inverter, with the battery retrofitted later. The same page gives the other route for a battery expected in the distant future: SMA recommends installing a PV inverter now and retrofitting with an AC solution, because the next generation of batteries may make today's hybrid unit less suitable.
Both routes are legitimate, so the useful step is to ask the installer to say in writing which one the quote assumes, whether a later battery would need its own inverter, and whether adding it would move the connection from G98 to G99. Siting, coupling and the grid paperwork for the battery itself are on the solar battery installation page.
To see what a quote for a panels-only design should itemise, read the cost guide.
Sources
- Solar panels (consumer guide), MCS, checked 23 October 2026.
- Smart Export Guarantee (SEG): earn money for exporting the renewable electricity you have generated, GOV.UK (DESNZ and Ofgem) (Published 1 January 2020), checked 23 October 2026.
- Solar panels: costs, savings and benefits explained, Energy Saving Trust (Last updated 1 October 2026), checked 23 October 2026.
- Rooftop solar panel installation: step-by-step guide, Energy Saving Trust (Last updated 1 October 2026), checked 23 October 2026.
- Solar power fact check, Energy Saving Trust (Last updated 13 August 2026), checked 23 October 2026.
- Energy storage options explained, Energy Saving Trust (Last updated 15 July 2026), checked 23 October 2026.
- Planned power cuts, SSEN, checked 23 October 2026.
- Tips to help you during a power cut, Electricity North West, checked 23 October 2026.
- G98, small scale connection, generation and storage, Electricity North West, checked 23 October 2026.
- Installation of up to 3.68kW per phase at one property, SSEN, checked 23 October 2026.
- How to register energy devices in homes or small businesses: guidance for device owners and installation contractors, GOV.UK (DESNZ) (Published 31 March 2021), checked 23 October 2026.
- Smart Export Guarantee (consumer guide), MCS, checked 23 October 2026.
- Sunny Boy Smart Energy (FAQ), SMA, checked 23 October 2026.
Common questions
Will the panels still produce electricity on a cloudy day?
Yes, at a lower output. MCS says panels work on cloudy days and during the winter, and the EST says solar cells do not need direct sunlight. How much they make depends on the weather, the direction of the roof and any shading.
Do I need a smart meter if I have no battery?
To be paid for exported electricity under the SEG you need a meter that records what you export. GOV.UK says it must be capable of half-hourly export readings and would typically be a smart meter.
Can a battery be added to an existing panels-only system?
In principle yes. SMA says a battery can be retrofitted on a hybrid inverter, or added through an AC solution alongside a PV inverter. GOV.UK lists battery storage among the changes that must be notified to the network operator, so the grid paperwork has to be revisited. Ask the original installer what the existing inverter supports before ordering anything.
Does a system without a battery need less paperwork?
It needs the same core records. The network operator must be notified, the installer should provide a Building Regulations Completion Certificate for notifiable work, and MCS says an MCS certificate should arrive within 10 working days of completion. A battery adds its own notification on top.