What does a solar diverter do?
A solar diverter measures the electricity your home is exporting and sends that surplus to a resistive load, usually the immersion heater in a hot water cylinder, instead of letting it flow to the grid. The Energy Saving Trust describes the idea as heating water "using an immersion heater powered by spare electricity from solar panels" via a diverter. myenergi says that "rather than exporting surplus electricity back to the grid" its eddi redirects power to an immersion heater, storage heater, underfloor heating or electric heater.
It does not act like a timer. Marlec says the iBoost+ uses pulse width modulation to divert "only the same as the excess power generated", rather than the immersion's full power. The load must be resistive with a mechanical thermostat: myenergi specifies "any electrical resistive load up to 3.68kW with a mechanical thermostat", and Marlec says the immersion needs thermostat controls "but no electronic controls" between it and the iBoost+.
How do the main models compare?
The table gives figures as stated on each maker's own pages on 22 October 2026. It covers three makers, gives no prices and is not a ranking.
| Model | Stated maximum load | How surplus is measured | Other points on the maker's page |
|---|---|---|---|
| Marlec Solar iBoost+ | 13 A resistive, "max 3kW immersion"; two immersions in turn | Wireless sender with a clamp at the meter; indoor range 1-30 m | Cut-in at 100 W of export; IP20; two-year warranty |
| myenergi eddi (single phase) | 3.68 kW maximum heater load; 100 W minimum | CT clamp with 5 m cable supplied; wireless harvi sensor for longer runs | WiFi or Ethernet and an app; 3 W in standby; three-year warranty |
| Fronius Ohmpilot | 3 kW single-phase or 9 kW three-phase, "continuously adjustable" | A Fronius Smart Meter, which the manual says is required | IP54, wall mounting; output cable no longer than 5 m |
For three-phase homes, myenergi lists a separate eddi+ with 0-9 kW output for three-phase heating elements, and Marlec's FAQ gives two options: one iBoost+ on one phase, or one on each phase. Marlec's spec page lists 3.6 kW only for the Australia and New Zealand version.
How is a diverter installed?
- Check the cylinder. Marlec says an immersion element must contain a thermostat and asks the electrician to test it first. It lists a hot water cylinder less than 30 m from the utility meter as a condition of suitability.
- Fit the measuring clamp. Marlec says the sender and clamp go in the meter cabinet, on the utility meter side of any Henley block so the readings show exports alone. myenergi supplies a CT clamp; Fronius requires its own smart meter.
- Fit the controller by the cylinder. Marlec says the cable from the iBoost+ to the immersions should be no more than 3 m. Fronius sets 5 m for the Ohmpilot.
- Wire it to the immersion. Marlec says the iBoost+ "must be connected exclusively to any immersion it is attached to", with no switches or timers in the output cable. myenergi says to wire the eddi in series with the immersion heater.
- Protect and commission. Fronius requires a type B16 A circuit breaker and a residual current circuit breaker for the Ohmpilot. Marlec's box includes a commissioning form for the installer to complete and the homeowner to keep.
The makers' wording on who fits it differs. Marlec says installation "should be done by a qualified electrician". Fronius says everyone involved in commissioning must be appropriately qualified. myenergi says an eddi can be installed yourself but recommends consulting an electrician "to be safe". Because the work is regulated, the next section applies either way.
Does fitting one need Part P notification or a network operator application?
In England, Approved Document P is the Building Regulation covering electrical safety in dwellings, and GOV.UK says its current edition "explains when notification of work is required". A council building control page lists notifiable work such as rewiring, replacing the main fuse box and work in a kitchen, shower room or bathroom. It recommends an electrician registered with a competent person scheme, who can self-certify the work and give you an Electrical Installation Certificate. Whether a diverter job is notifiable depends on how it is wired, so ask the electrician before work starts and ask which certificate you will receive.
The same page says all electrical work "should follow the safety standards in BS 7671". The IET says the transition period for Amendment 2 ended on 15 October 2026 and that BS 7671:2018+A4:2026 is now the current edition.
The network operator is a separate matter. MCS lists the technologies for which a network operator must be notified as heat pumps, solar PV, wind and battery storage, and a diverter is not on that list. MCS's installer guidance ties G98 and G99 to the size of the solar PV installation in amps per phase, so that paperwork is about the generating equipment. Ask the installer to confirm in writing that no network operator paperwork is needed for the diverter itself.
When does a diverter make sense?
Marlec's checklist for a suitable home is on-site generation, a hot water cylinder within range of the meter, and surplus that is exported. The question is what each exported kilowatt-hour is worth against the use you would make of it. Exported, it earns the rate your Smart Export Guarantee (SEG) licensee sets; Ofgem says licensees determine the rate and that SEG tariff rates must always be above zero. Diverted, it displaces whatever would otherwise heat that water. Compare the export rate you have been offered with the cost per kilowatt-hour of heating water your current way, using your own bills. This guide builds no savings model.
Three points help. A home without a cylinder has no immersion to feed. Once the immersion's thermostat is satisfied, nothing more is sent. And with a battery, Marlec's default cut-in of 100 W of export can be raised in 50 W steps up to 500 W so the two devices do not compete. A solar-mode car charger competes for the same surplus too; see charging an electric car with solar panels. Marlec also says the iBoost+ does not affect Feed-in Tariff generation payments. Export is read by the export meter, covered in the solar panel meters guide, and the guide to solar panels without a battery sets diversion alongside other ways to use more of your own generation.
A diverter is an add-on to a solar installation, so ask for it as a separate line on the quote and compare the main system per kilowatt with the DESNZ medians on the cost guide. You can send an enquiry through this site's quote form.
Sources
- Marlec, Solar iBoost+, specifications and FAQs, checked 22 October 2026.
- myenergi, eddi, eddi overview and eddi+, checked 22 October 2026.
- Fronius, Ohmpilot technical data and operating instructions, checked 22 October 2026.
- GOV.UK, Electrical safety: Approved Document P, checked 22 October 2026.
- Building Control Partnership (Hampshire), domestic electrical work, checked 22 October 2026.
- IET, ensure you are up to date with BS 7671, checked 22 October 2026.
- MCS, notifying DNOs, checked 22 October 2026.
- Ofgem, Smart Export Guarantee, checked 22 October 2026.
- Energy Saving Trust, storing energy, checked 22 October 2026.
Common questions
Do I need a hot water cylinder?
These devices heat a cylinder through its immersion element, so a home with no cylinder has nothing to feed. Marlec lists a hot water cylinder less than 30 m from the utility meter as a condition of suitability. myenergi also lists storage heaters, underfloor heating and electric heaters as possible loads.
Does a diverter affect Feed-in Tariff payments?
Marlec says that in the UK the iBoost+ does not affect Feed-in Tariff generation payments, and that a deemed export contract remains unaffected. Other makers' pages were not read for this point, so ask the installer to confirm for your own contract.
What happens in a power cut?
Marlec's FAQ says the iBoost+ detects that no export is taking place and stops heating water, then resumes when export is next detected, with its settings kept in memory. Check the manual for any other model you are considering.
Can a diverter run on a three-phase supply?
Marlec's FAQ gives two options: one iBoost+ on one phase with its own 3 kW immersion, or one on each phase, with the sender, clamp and unit on the same phase. myenergi sells a three-phase eddi+ and Fronius lists a 9 kW three-phase Ohmpilot.