What size inverter do you need? UK sizing and the G98 limit
Updated 10 November 2026 · SEO Dons Editorial
What decides the inverter size?
Three limits apply, and they pull in different directions.
- The grid route. Electricity North West says that where an installation includes an inverter, its rating is assumed to be the inverter's continuous steady state rating. The panels are not the measure.
- The manufacturer's ceiling. Each model lists the largest array it accepts. SMA's manual gives 5,500 Wp for its 3.6 kW model, and Fronius gives 5.52 kWpeak for its Primo GEN24 3.6. Both models are rated 3,680 W AC.
- Any battery plan. Whether a battery shares the inverter or has its own changes the total the operator counts, as below.
Array size itself comes from usage and roof space, covered in how many solar panels you need. If you arrived from a "20% rule" search, the 20% rule page covers it. Optimisers fitted under the panels work with the inverter rather than replacing it; the solar optimisers guide explains when a quote should include them.
What is the G98 limit in kW?
G98 covers generation up to 16 amps per phase. Electricity North West puts that at 3.68 kW for a single-phase system and 11.04 kW for three-phase, and the ENA says a generator under 3.68 kW per phase falls under G98. The figure is simple arithmetic: 16 A at 230 V is 3,680 W.
The line is sharp. SMA's manual lists a rated current of 16 A at 230 V for its 3.6 kW model but 17.4 A for its 4.0 kW model, so on Electricity North West's definition the 4.0 kW inverter is over the G98 line and falls to G99. At the top of the domestic range, the 10kW solar system guide explains when G99 applies.
Why can a 4 kWp array sit behind a 3.68 kW inverter?
Mainly because 3.68 kW is the G98 line, so an inverter at that rating keeps the system on connect-and-notify. The array can be larger because the kWp on the label is a laboratory rating. PVGIS defines installed peak power as what the manufacturer declares the array can produce under standard test conditions: a constant 1,000 W of solar irradiation per square metre at an array temperature of 25 degrees C. PVGIS's average June day for a south-facing 35 degree plane at 52.486 N, 1.89 W (central Birmingham) peaks at 578.91 W per square metre at 12:00 UTC, about 58% of the test figure.
That average smooths out individual clear days, so it cannot show how often an array exceeds its inverter's rating. What it does show is that on an average June day the irradiance on the panels stays well below the test figure all day. When output does exceed the rating, the inverter holds it there: National Grid Electricity Distribution says a device limited to 3.68 kW will not output more than that whatever the demand in the home.
No ratio is fixed. The operator pages checked limit the inverter rating, not the array, so the ceiling is the datasheet. Using the two examples above, 5,500 Wp on a 3,680 W inverter is a ratio of about 1.49, and 5.52 kWp on 3,680 W is about 1.50. Ask an installer for the modelled energy lost at the proposed ratio rather than accepting a rule of thumb.
Which array and inverter pairings land on which route?
These are worked examples from the rules above, not designs or recommendations.
| Array | Inverter, AC | Array / inverter | Single-phase route | What the sources say |
|---|---|---|---|---|
| 3.0 kWp | 3.0 kW | 1.00 | G98 | SMA's 3.0 kW model is rated 3,000 W with a 5,500 Wp array maximum. |
| 4.0 kWp | 3.68 kW | 1.09 | G98 | The rating at the inverter is what counts. |
| 5.0 kWp | 3.68 kW | 1.36 | G98 | Inside the 5,500 Wp and 5.52 kWp ceilings above. |
| 6.0 kWp | 3.68 kW | 1.63 | G98 | Above both ceilings above, so the chosen model's datasheet decides. |
| 4.0 kWp | 4.0 kW | 1.00 | G99 | SMA's 4.0 kW model draws 17.4 A at 230 V, over 16 A. |
| 6.0 kWp | 5.0 kW | 1.20 | G99 | Form goes in before installation. UK Power Networks approves automatically if maximum export after any limit is under 5 kW. |
| 4.0 kWp plus battery on a hybrid inverter | 3.68 kW | 1.09 | G98 | For a battery behind the same inverter, National Grid Electricity Distribution counts only the inverter's capacity. |
| 4.0 kWp plus battery on its own inverter | 3.68 + 3.68 kW | n/a | G99 fast track | Both inverters count. SSEN's second fast-track category covers 7.36 kW total with export limited to 3.68 kW. |
When do G99 or an export limit apply?
G99 applies above 16 A (3.68 kW) per phase, and GOV.UK says the form goes to the operator before installation. Small systems can use the fast track. SSEN sets out three categories:
- SGI-1: registered capacity of 16 A (3.68 kW) or less, with the manufacturer's limit factory-set in the inverter, so no external limiter is required.
- SGI-2: total registered capacity up to 32 A (7.36 kW), with export limited to 16 A (3.68 kW).
- SGI-3: units up to 32 A (7.36 kW) and a total up to 60 A (14.72 kW), with export limited to 32 A (7.36 kW).
An inverter can also be limited internally. National Grid Electricity Distribution says a 5 kW inverter limited to 3.68 kW should carry 3.68 kW as its registered capacity in the compliance paperwork, and that this setting is separate from an export limit, which monitors current flowing out of the home. How each operator then handles a limit is compared in G98 and G99 with each network operator.
What if a battery may come later?
National Grid Electricity Distribution says a DC-connected battery sits behind the same inverter as the panels (a hybrid inverter) and only that inverter's capacity is counted. An AC-connected battery is a standalone inverter, and both inverter capacities are counted. SP Energy Networks describes a relaxation for solar with storage: total generation up to 7.36 kW including the battery, type-approved devices, and export limited to 3.68 kW per phase by a G100 device. Whichever design is chosen, ask the installer to state the registered capacity and route in writing, and see what a quote should itemise in the cost guide. Planning a system? You can send an enquiry through the quote form.
Sources
- Connecting generation to the electricity networks, Energy Networks Association, checked 22 October 2026.
- G98 Micro-Generation and Storage Connections, Electricity North West, checked 22 October 2026.
- Micro generation (G98), National Grid Electricity Distribution, checked 22 October 2026.
- Generation (G99), National Grid Electricity Distribution, checked 22 October 2026.
- Customer Limitation Schemes, National Grid Electricity Distribution, checked 22 October 2026.
- G99 Fast Track Process, SSEN, checked 22 October 2026.
- Installation of up to 3.68kW per phase at one property, SSEN, checked 22 October 2026.
- Export Limitation, SP Energy Networks, checked 22 October 2026.
- Solar panels and energy storage: what is involved, UK Power Networks, checked 22 October 2026.
- How to register energy devices in homes or small businesses, GOV.UK (DESNZ) (Published 31 March 2021), checked 22 October 2026.
- G98/NI installations FAQs, NIE Networks, checked 22 October 2026.
- Sunny Boy 3.0 / 3.6 / 4.0 technical data, SMA Solar Technology, checked 22 October 2026.
- Fronius Primo GEN24 3.6 technical data, Fronius, checked 22 October 2026.
- PVGIS 5 user manual, European Commission Joint Research Centre, checked 22 October 2026.
- PVGIS DRcalc June daily profile, 52.486 N 1.89 W, 35 degrees, due south, European Commission Joint Research Centre, checked 22 October 2026.
Common questions
Is a 6 kW inverter enough to run a house?
A 6 kW rating is the most the inverter can deliver at once, not a measure of what a house uses. The grid supplies the rest, and a system on the G98 route must shut down in a power outage, according to National Grid Electricity Distribution's G98 criteria. At 6 kW the route is G99, since it is above 3.68 kW per phase.
Can a larger inverter be set to 3.68 kW?
Yes in principle. National Grid Electricity Distribution gives the example of a 5 kW inverter limited internally to 3.68 kW, with the compliance paperwork showing 3.68 kW as its registered capacity. SSEN lists the manufacturer's limit as the unit's registered capacity.
Where do I check that an inverter is approved?
The ENA provides a register where manufacturers declare compliance with G98 or G99, and NIE Networks tells installers to check the ENA Type Test Register through the Connect Direct site. SSEN asks that the kW on the type test certificate matches the inverter on the schematic.
Do three-phase homes get a higher G98 limit?
Yes. Electricity North West gives 11.04 kW for three-phase systems, which is 16 A on each of three phases. A single-phase 3.68 kW limit does not apply to the whole three-phase total.