What do people mean by the 20% rule?
Pages that rank for the question use the phrase for different ideas. The commonest is to size a system to produce about 20 per cent more than your usage; one UK page defines it as sizing your system "to produce 20% more energy than your average monthly consumption". Another uses 20 per cent for a drop in output that suggests the panels need cleaning. A third says an array should be about 20 per cent larger than your typical needs or the inverter's rated capacity. A "120% rule" also turns up in results.
These readings conflict, and none appears in the official documents read for this guide. Ask any installer who uses the phrase which meaning they intend and where the number comes from.
Do any official UK sources use it?
No. The pages read for this guide were the Energy Networks Association's connection page, two network operators' pages, MCS's pages on notifying network operators and on its installation standard, the IET's Wiring Matters articles on BS 7671, and SI 2026/896 on permitted development. None uses "20%", "20 per cent" or "120%". They set limits in amps per phase, kilowatts, metres and a sum of currents.
What actually limits a UK home system?
| Limit | What the source says |
|---|---|
| Roof and planning (England) | SI 2026/896, in force 27 August 2026, does not permit equipment on a dwellinghouse pitched roof "protruding more than 0.2 metres beyond the roof slope" or higher than "the highest part of the roof (excluding any chimney)" |
| MCS design | MIS 3002 version 6.0 is mandatory for MCS installers from 18 June 2026; where no certified mounting system exists, installers must evidence "structural and wind loading calculations" |
| Grid connection | G98 covers installations "up to 16 amps per phase" (3.68 kW single phase, 11.04 kW three phase); anything larger falls into a G99 application |
| Consumer unit and main fuse | BS 7671 Regulation 551.7.2, as the IET explains it, adds the incoming protective device's rating and the generator's output and compares the total with the assembly's rated current |
On the roof, MCS's consumer page adds that which way the roof faces, shade and local weather all affect how much power a system provides.
How does the 16 A per phase limit work?
The Energy Networks Association says a generator "less than 3.68kW/phase" falls under G98 and one "greater than 3.68kW/phase" under G99. MCS says that under G98 the network operator is notified within 28 days of commissioning, while G99 needs prior permission to connect. Electricity North West adds that where an installation includes an inverter, "the rating of the installation is assumed to be the inverter's continuous steady state rating". The connection route therefore turns on the inverter rating, not only on the panel count. The inverter sizing guide covers that choice.
What does a 100 A main fuse mean for solar?
The IET explains that when a generator runs in parallel with the public network, the consumer unit's current rating must not be exceeded. Regulation 551.7.2 requires the assembly's rated current to be at least the incoming protective device's rating plus the generator's rated output. In the IET's example, a 16 A PV output on a board rated 100 A behind a 100 A fuse gives 100 A + 16 A = 116 A, so the requirement is not met.
The IET lists ways round it: a board with a higher rated current, a manufacturer's declaration for a board that can distribute both supplies, or connecting the PV upstream of an extra protective device. It calls downgrading the supply fuse undesirable because it limits supply capacity. The wording quoted is from BS 7671:2018+A2:2022+A3:2024. The IET's September 2024 preview of Amendment 4 described a proposed redraft, and Amendment 2's transition ended on 15 October 2026, so ask the electrician which edition the certificate will cite.
How should you size a system instead?
Start from your usage and your roof, then check the result against the inverter rating that decides the grid route and the consumer unit rating. The guide to how many panels you need takes the first step, and the cost guide shows how DESNZ groups prices by system size. You can also send an enquiry through this site's quote form.
Sources
- Energy Networks Association, connecting generation to the electricity networks, checked 22 October 2026.
- Electricity North West, G98 micro-generation and storage connections, checked 22 October 2026.
- National Grid, Generation (G99), checked 22 October 2026.
- MCS, notifying DNOs, checked 22 October 2026.
- MCS, update to MIS 3002 (18 March 2026), checked 22 October 2026.
- MCS, solar panels, checked 22 October 2026.
- legislation.gov.uk, SI 2026/896, checked 22 October 2026.
- IET Wiring Matters, microgeneration and the rated current of a consumer unit (November 2024), checked 22 October 2026.
- IET Wiring Matters, impact of Amendment 4:2026 (September 2024), checked 22 October 2026.
- IET, ensure you are up to date with BS 7671, checked 22 October 2026.
Common questions
Is a system 20% bigger than my usage a good idea?
No official source read for this guide sets that target. Ask the installer to show how the proposed size relates to your usage, your roof area and the inverter rating that goes on the connection paperwork.
Does the 3.68 kW G98 limit cap my panels at 3.68 kW?
Electricity North West says an installation with an inverter is rated at the inverter's continuous steady state rating, so the route turns on the inverter. Ask the installer how the capacity will be recorded on the G98 form and the MCS certificate.
Do I need a new consumer unit when I add solar?
It depends on the unit's rated current, the supply fuse and the inverter output. The IET's example is a 100 A board behind a 100 A fuse with a 16 A PV output, which totals 116 A and does not meet Regulation 551.7.2. The electrician decides which fix applies.
Is a 120% rule used in the UK?
None of the UK documents read for this guide uses a 120% figure. The test the IET describes adds the incoming protective device's rating and the generator's output and compares the total with the assembly's rated current.