Getting solar panels: the 8 steps from first quote to your first export payment
Updated 23 October 2026 · SEO Dons Editorial
What are the eight steps, in order?
| Step | What happens | Guide |
|---|---|---|
| 1. Decide roof and size | Pick the usable roof faces and a rough system size | How many panels you need |
| 2. Get quotes | Compare written quotes | Quote form |
| 3. Survey | Roof, shading and electrics checked in person | Solar survey |
| 4. Design and grid route | G98 or G99 decided | G98 vs G99 |
| 5. Planning check | Listed building and conservation area status confirmed | Permitted development rules |
| 6. Installation day | Scaffold, fitting and testing | How panels are installed |
| 7. Commissioning and paperwork | Certificates and grid notification | MCS certificate |
| 8. Export registration | An export tariff applied for | Export MPAN |
Steps 1 to 3: what do you settle before work starts?
Step 1. Decide which roof faces to use and roughly what size to aim for
Direction and shade drive the choice. MCS lists which way the roof faces and whether it is in the shade among the factors that affect how much power a system provides. The Energy Saving Trust (EST) adds that east-facing panels generate more in the morning and west-facing panels do better in the afternoon and early evening, so a roof that does not face south can still suit a household whose use matches. Sizing from your own usage is in how many solar panels you need, and the physical fit in solar panel sizes.
What you need: the usable roof faces, twelve months of electricity use, and any shading you already know about.
Step 2. Get quotes
The EST recommends quotes from at least three installers, and says installation by an MCS-certified installer may be a requirement for export tariffs. MCS says a certified installer's quote should be clear and give a full breakdown of what you are buying, and that the installer has a duty to keep you informed about products, the installation timeline and any delays. What a written quote must show, and how to compare two, is covered in solar panel quotes: what each line should say. This page does not rank installers; what a quote should itemise is covered in the cost guide, and you can send an enquiry through the quote form.
What you need: each quote in writing, with system size, equipment and what is and is not included. If you plan to borrow, check the deposit and cancellation points in paying for solar panels before you sign.
Step 3. Survey
The EST says an assessor comes to look at the roof to make sure it is safe to hold the panels, and designs the system around the roof setup and available space. The Planning Portal says the roof's ability to carry the load has to be checked and proven. The visit is explained in what happens at a solar survey.
What you need: access to the loft hatch and consumer unit, and any listed or conservation area status.
Steps 4 to 6: what is designed, checked and built?
Step 4. Design and grid route (G98 or G99)
GOV.UK says the installation contractor must examine the device and the connection to decide whether the network operator is told before or after installation. For connect-and-notify (G98), the form goes in within 28 days of installation. For apply-to-connect (G99), it goes in before installation, and the network operator will be in touch within 45 days for low-voltage devices. Electricity North West gives the G98 limit as 16 amps per phase, which it states as 3.68 kW for single-phase systems. The rules are in G98 vs G99 explained, and the portals by operator in G98 and G99 by network operator.
What you need: the inverter rating written on the design, and your MPAN.
Step 5. Planning check
MCS says that in most cases you don't need planning permission to install solar panels, but a listed building, a Conservation Area or a World Heritage Site may bring extra rules, and it suggests reaching out to your local council or a certified installer to discuss them. Historic England says consent is required for any PV installation on a listed building or scheduled monument. The Planning Portal says its guidance relates to the planning regime for England and that policy in Wales may differ. The August 2026 changes are in the permitted development guide.
What you need: the planning position confirmed in writing before the installation date is set.
Step 6. Installation day
The EST says an installer should take one to two days, with the scaffold sometimes going up a few days earlier, and that the power may need to go off briefly while the panels are connected. The day itself is described in how solar panels are installed and the surrounding timeline in how long installation takes. One check belongs before the date: GOV.UK makes it the owner's responsibility to ensure that the network operator has received the notification and, for an apply-to-connect system, has granted authorisation before the work is carried out.
What you need: the scaffold dates, someone to give access, and the network operator's reply if the system is G99.
Steps 7 and 8: what happens once the system is on?
Step 7. Commissioning and paperwork
The EST says the installer runs tests to make sure everything is working, shows you how to check what the panels generate, and registers the system with the network operator. GOV.UK says the owner should receive a Building Regulations Completion Certificate for notifiable work, and MCS says an MCS certificate should follow within 10 working days of completion, with a handover pack that includes product details and the workmanship warranty. If the certificate is late or missing, see the MCS certificate guide.
What you need: the MCS certificate, the Building Regulations Completion Certificate, the network operator's confirmation and the handover pack.
Step 8. Register for export payments
Under the Smart Export Guarantee (SEG), GOV.UK says you need a meter capable of half-hourly export readings, typically a smart meter, and must show that the installation and the installer are MCS-certified or certified under an accredited equivalent scheme. MCS describes the application: choose a SEG supplier, which can be different from your energy company, pick a tariff and apply online with your smart meter data and MCS certificate. The EST notes that SEG tariffs are not available in Northern Ireland, where export payments work differently. Meters and the supply-point number are covered in solar meters explained and the export MPAN guide.
What you need: the MCS certificate and a smart meter that records exports.
Where does the order go wrong?
- Fixing a start date before the grid route is known. An apply-to-connect system needs the network operator's authorisation before the work is carried out, so a date set earlier may have to move.
- Treating the certificate as a formality. The export application asks for it, and MCS puts the deadline at 10 working days from completion.
- Leaving roof work until after the panels. The NFRC says a roof without enough remaining lifespan should be replaced before panels are fitted.
Sources
- Rooftop solar panel installation: step-by-step guide, Energy Saving Trust (Last updated 1 October 2026), checked 23 October 2026.
- Solar panels (consumer guide), MCS, checked 23 October 2026.
- Smart Export Guarantee (consumer guide), MCS, checked 23 October 2026.
- How to register energy devices in homes or small businesses: guidance for device owners and installation contractors, GOV.UK (DESNZ) (Published 31 March 2021), checked 23 October 2026.
- Smart Export Guarantee (SEG): earn money for exporting the renewable electricity you have generated, GOV.UK (DESNZ and Ofgem) (Published 1 January 2020), checked 23 October 2026.
- G98, small scale connection, generation and storage, Electricity North West, checked 23 October 2026.
- Consents and permissions for PV systems, Historic England, checked 23 October 2026.
- Building regulations: solar panels, Planning Portal, checked 23 October 2026.
- Planning permission: solar equipment mounted on a house or a block of flats, Planning Portal, checked 23 October 2026.
- When Solar PV is Installed on End-of-Life Roofs, NFRC (Dated 26 March 2026), checked 23 October 2026.
- Smart Export Guarantee explained, Energy Saving Trust (Last updated 20 October 2026), checked 23 October 2026.
Common questions
Who applies to the network operator, the owner or the installer?
GOV.UK says the installation contractor submits the form, within 28 days of installation for G98 or before installation for G99. MCS says that in some cases the installer can notify the network operator on your behalf. GOV.UK still makes it the owner's responsibility to ensure the notification has been received.
Do I apply for export payments before or after installation?
After. MCS describes the order as installing the system, choosing a SEG supplier, picking a tariff and applying with your smart meter data and MCS certificate. That is why the certificate matters in step 7.
Do the same steps apply in Scotland, Wales and Northern Ireland?
The GOV.UK guidance on registering energy devices applies to England, Scotland and Wales. The Planning Portal says its planning guidance relates to England and that Welsh policy may differ, and the EST says SEG tariffs are not available in Northern Ireland. Check planning and export arrangements locally.
What if the roof needs work before panels go on?
The NFRC says a roof without sufficient remaining lifespan should be replaced before panels are fitted, and recommends a pre-installation roof condition assessment. The Planning Portal adds that some strengthening work may be needed. Either would normally be raised at the survey in step 3.