solarpanelsandinstallation

What happens at a solar survey, and how to prepare for it

Updated 23 October 2026 · SEO Dons Editorial

What is a solar survey for?

A survey is the visit that turns a general idea into a design for one roof. The Energy Saving Trust (EST) describes it as an assessor coming to look at your roof to make sure it is safe to hold the panels, and then designing the system to be as efficient as possible for your roof setup and the space available. Every later step, from the grid application to the scaffold booking, depends on what that visit finds.

It is not the same as the installation day, which is covered in how solar panels are installed, or the wait between quote and switch-on, which is covered in how long installation takes. If a design was drawn up remotely, that timeline guide explains the written note MCS requires on the estimate, which is a good reason to ask whether anyone will visit in person.

What does the surveyor check?

CheckWhat is looked atWhat the sources say
Roof structure and coveringWhether the roof can carry the panels, and how long the covering has leftThe Planning Portal says the roof's ability to carry the load of the panel has to be checked and proven, and some strengthening work may be needed. The NFRC says the key safeguard is a pre-installation roof condition assessment, and that a roof without enough remaining lifespan should be replaced before panels are fitted.
Shading and orientationWhich way the roof faces, and shade from trees, chimneys and neighbouring buildings through the day and the seasonsThe EST says installers will assess how shading affects the roof throughout the day and across different seasons. MCS lists the direction the roof faces and shade among the factors that affect output. See solar panel shading.
Space and layoutHow many panels fit once the roof shape, chimneys and skylights are allowed forThe EST lists roof shape, chimneys, skylights, shading and planning or conservation area requirements as limits on panel numbers. Sizing from usage is in how many solar panels you need. Before the visit, a rough count from the solar panel roof calculator gives you a figure to compare with the surveyor's layout.
Existing electrics and inverter positionWhere the inverter's AC output will join the home's electrics, and where the inverter and isolators can goThe Planning Portal says building regulations also cover the electrical installation, and that connection work must be done by a qualified electrician. The IET says inverters need a means of isolation on both the AC and DC side.
Grid routeWhether the network operator is told after installation (G98) or before it (G99)GOV.UK says the installation contractor must examine the device and the required connection to decide which. The EST adds that local grid capacity and export limits can influence the final size. See G98 vs G99 explained.
Access and scaffoldHow the roof can be reached safely, and where the scaffold can standThe EST says the scaffold might go up a few days before the installation date. The rules on pavement licences are in scaffolding for solar panel installation.
Planning and heritage statusWhether the building is listed or in a conservation areaMCS says that in most cases planning permission is not needed, but a listed building, a Conservation Area or a World Heritage Site may bring extra rules. Historic England says consent is required for any PV installation on a listed building or scheduled monument. See the permitted development guide.

If a battery is likely later, say so at the survey so the inverter position can allow for it. Where one can sit is covered in home battery in a garage, utility room, loft or outside.

What does the survey settle about the grid connection?

It settles the route, and the route sets the order of events. GOV.UK says that for a connect-and-notify installation the installer can fit the system and submit the G98 form within 28 days of installation, while an apply-to-connect installation needs the G99 form submitted before installation, with the network operator replying within 45 days for low-voltage devices. That is why the route is worth asking about at the survey, before a start date is fixed.

The notification needs details that the survey can collect. SSEN's page for small systems asks for the address and the Meter Point Administration Number (MPAN) if available, the proposed total generation capacity, and an inverter type test certificate whose power rating matches the inverter shown on the schematic. What an export MPAN is, and how it differs, is in the export MPAN guide.

How should you prepare for a survey?

  1. Know how much electricity you use. Have twelve months of usage, in kWh, from a bill or supplier account, so the design can be matched to how the home uses power.
  2. Have the MPAN to hand. It is one of the details a grid notification asks for.
  3. Say if the building is listed or in a conservation area. It changes what consent is needed before anything is fixed to the roof.
  4. Mention any roof work you are expecting. If the covering is near the end of its life, the NFRC advises dealing with the roof first.
  5. Clear the way to the loft hatch, the consumer unit and the likely inverter spot. The surveyor needs to see them.
  6. Write down your questions. The ones in the next section are a good start.

What should you have in writing afterwards?

  • Which grid route applies and when the forms will go in.
  • The planning and consent position for the building.
  • Where the inverter, isolators and any battery will go.
  • When the scaffold goes up and comes down.
  • What happens if the roof check turns up a problem.

Those answers feed straight into the next stages in getting solar panels, step by step. After the visit, the written quote should cover the lines listed in solar panel quotes compared. If you are comparing designs, you can send an enquiry through the quote form, and the services page lists the roof types and installation types covered.

Sources

Common questions

What if the survey shows the roof is not suitable?

The Planning Portal says some strengthening work may be needed, and the NFRC says a roof without enough remaining lifespan should be replaced before panels are fitted. Other layouts, such as a different roof face or a ground mount, are covered on the services page.

Does the survey decide whether planning permission is needed?

It should flag it. MCS says that in most cases planning permission is not needed, but a listed building, a Conservation Area or a World Heritage Site may bring extra rules, and it suggests reaching out to the local council or a certified installer to discuss them. Historic England says consent is required for any PV installation on a listed building.

Is the grid application made at the survey?

The survey is where the route is worked out. GOV.UK says the installation contractor must examine the device and the connection to decide whether the network operator is informed before or after installation. A G99 application has to be submitted before installation.

Who should be at home for the visit?

Someone who can give access to the loft hatch, the consumer unit and the possible inverter position, and who can answer questions about how the home uses electricity.