Solar Together explained: how the council group-buying scheme works

Updated 23 October 2026 · SEO Dons Editorial

Is Solar Together the same as Switch Together?

In practice, yes. The operator's site says "Switch Together is a trading name of iChoosr Ltd", and its history page records that Solar Together arrived in 2015 and that "That team became Switch Together". Councils say the same: Walsall writes "Previously known as Solar Together", Cheshire East "Solar Together – now Switch Together", and Worcestershire "previously known as Solar Together". Walsall adds that the new name covers solar panels, battery storage, heat pumps and energy tariffs in one programme. This guide covers the solar and battery side and describes the published terms rather than summarising reviews.

How does the scheme work, step by step?

  1. Registration. A short survey about your home, which the operator says helps it create your personal offer and assess eligibility.
  2. Auction. Vetted installers bid. Cheshire East's page adds that "the more people that register, the better the deal should be for each household".
  3. Personal offer. An emailed offer with estimated costs and installer details.
  4. Decision. You accept or walk away. Lincolnshire's page gives a four-week window and Windsor and Maidenhead's about six weeks, including an online meeting with the operator and installer.
  5. Installation. The winning installer surveys the roof and sets a date. Cheshire East says installations are planned to be completed six months after accepting.

Registration carries no charge, but the purchase is yours. Cheshire East says "a small refundable deposit" is required when you accept, and Solihull's page names a £150 deposit that is refunded if the roof proves unsuitable. Wiltshire's 2026 page says a loan option is available this year to help with the upfront cost.

Does the price change after the roof survey?

The personal offer is built from what you told the operator at registration, and the on-site roof survey comes later. Solihull's page says that after you pay the deposit "the installer will arrange an on-site roof survey", and that if the roof is unsuitable you are told and the deposit is refunded. Worcestershire gives asbestos as an example of an unsuitable roof and says the deposit "will be fully refunded".

The operator's support page adds, in its flat-roof answer, that if extra costs not included in your personal offer are discovered, you are "entitled to a refund of your acceptance deposit" if you cancel. Ask the installer in writing what would count as an extra cost before you pay, and read the solar survey guide for what a survey should check.

Who does what: the operator, the council and the installer?

The operator, iChoosr, runs registration and the auction. Worcestershire's page says the council "does not select the contractor or monitor their installations" and only helps to promote the scheme, and that iChoosr is responsible "up until the moment you accept your personal recommendation and pay your deposit", after which the winning installer takes over. Cardiff says its role is "limited to promotion only" and that if you accept you "will contract with its approved installers".

The operator's terms agree. Products and services "are not provided by iChoosr, but by third parties", the contract is between you and the installer, and nothing on the site is a recommendation or endorsement of any installer. Cheshire East tells residents to take independent advice before contracting with a supplier the operator recommends, and says the council funds promotion but expects to be cost neutral because it will receive contributions via iChoosr from successful installer bids, based on completed installations. The operator says its installers are MCS accredited and members of a consumer code.

Which councils ran a 2026 round, and when?

Each council sets its own window. These are the dates on the councils' own pages as read on 22 October 2026:

AreaWhat the council's page says
WalsallRegistration "opens on Monday 23 February 2026 and closes on Sunday 26 April 2026"
SolihullRegister "from Monday 23 February to Sunday 26 April"
Worcestershire"Registrations for the Switch Together Worcestershire 2026 scheme have now closed"
Cardiff (South East Wales)"Registration for the scheme closed on 5 June 2026"
West BerkshireRegistration "opens on 1 June 2026 and closes on 24 July 2026"
North East LincolnshireOpened 1 June 2026; closes 24 July 2026
LincolnshireRegistration "is closing on Friday, 24 July" (news item published 17 July 2026)
Windsor and Maidenhead"Registration will close Friday 24 July 2026"; the page still describes the period as "now open"
WiltshireScheme "open until 7 August 2026" (news item published 2 June 2026)
Cheshire East with Warrington and Cheshire West and ChesterOpens for registrations 3 August 2026 and closes 25 September 2026
King's Lynn and West Norfolk"Register by 25 September 2026"
NorwichScheme "run seasonally (4 times per year)"; no dates, and the page points to the operator's site to see whether a scheme is open

None of these pages gives a closing date later than 25 September 2026, so this guide cannot say a round is open on 22 October 2026. The operator's partner page has an "Active Schemes" heading that lists Surrey and West Yorkshire for solar and battery storage, but the Surrey area page itself reads "We're not open in your area at the moment". Treat that list as a pointer, and check your postcode and your council's page. This site's Cambridge, Norwich and Northampton pages say how the scheme has featured locally.

How do you compare an offer with DESNZ medians and an independent quote?

The operator's own benchmark is its market-price estimate. Solihull's page says registrants "will receive an indication of the current market price for a solar PV system on your property", which is "the price Switch Together Solar aims to beat through group-buying". That is a comparison with the operator's estimate, not an independent quote. Worcestershire's page recommends getting "at least more than one solar panel quote before making a decision". To test a personal offer yourself:

  1. Multiply panels by panel wattage to get kilowatts, then divide the offer price by that figure.
  2. Compare the result with the DESNZ 2025/26 medians on the cost guide. Use the total installed capacity (TIC) series, which DESNZ says gives costs "typically 6 - 12% lower" than the declared net capacity series, and match the size band: in DESNZ's own example a system of 3.9 kW DNC and 4.1 kW TIC lands in the 0-4 kW band on one basis and the 4-10 kW band on the other.
  3. Get a written quote for the same specification from an MCS installer, then line up the inverter, scaffolding, any battery and extras. The operator lists a power diverter, an EV charger and bird proofing as optional upgrades; see the diverter guide and the bird-proofing guide.
  4. Compare warranties. Solihull's page gives a product warranty of at least 10 years and a workmanship warranty of at least 10 years, alongside the panel maker's power output warranty.
  5. Read the deposit and refund conditions in the personal offer before you accept.

The step-by-step guide and the overview of energy suppliers that install solar show other routes to compare against, and you can send an enquiry through this site's quote form.

Sources

Common questions

Can I join if I already have solar panels?

Cheshire East's page says you can also register to have battery storage added to existing solar panels. Whether a scheme is open for your postcode is a separate question, so check the operator's postcode checker and your council's page.

Is the scheme only for homeowners?

Wiltshire's 2026 page says the scheme is open to homeowners, small and medium-sized businesses, commonhold associations and community organisations. Windsor and Maidenhead says a business should own its roof or have the owner's approval. Each council sets its own eligibility.

Can the scheme fit flat roofs or wall mounts?

The operator's support page says it only offers roof-mounted solar panels, so wall and ground mounts are outside the scheme. It says panels can go on a flat roof using frames, and that many flat roofs need a structural engineer survey, which you may have to arrange yourself.

Do I need planning permission?

Worcestershire's page says solar panels are permitted development for most domestic properties, with listed buildings needing listed building consent and conservation areas possibly needing permission. The England rules changed on 27 August 2026, so read the permitted development guide on this site as well.