Is Aberdeen a poor place for solar panels?
Not by the PVGIS numbers, which put a south-facing Aberdeen roof below southern England and above Glasgow, with nearly all of the shortfall in winter. PVGIS, the European Commission's solar tool, gives yearly and monthly output for a 1 kWp array tilted at 35 degrees, facing due south, with 14% system losses. It was run at a point in the centre of Aberdeen, Peterhead, Banchory, Glasgow and London.
| Place | Year (kWh per kWp) | June | December |
|---|---|---|---|
| Aberdeen | 893 | 118 | 21.1 |
| Peterhead | 879 | 118 | 18.9 |
| Banchory | 877 | 113 | 18.5 |
| Glasgow | 853 | 110 | 19.4 |
| London | 1,019 | 123 | 36.3 |
Aberdeen is about 12% below London over a year, about 4% below in June and about 42% below in December, and about 5% above Glasgow. Peterhead on the coast and Banchory up Deeside both land about 14% below London, and their December figures are lower than Glasgow's. Midwinter is the part to plan around: a 1 kWp array in Aberdeen gives about 21 kWh in December against about 118 in June. The angle and direction guide covers how pitch and orientation move those figures, and the sunniest places in Scotland guide ranks more locations.
Does the city or the shire decide?
It depends on the address, because Aberdeen City Council and Aberdeenshire Council are separate planning authorities. The National Records of Scotland put Aberdeen City at 230,180 people and Aberdeenshire at 264,640 in mid-2025. Class 6HA, the Scottish permitted development right that has applied since SSI 2024/102 came into force on 24 May 2024, is the same on both sides of the boundary. Panels may stand no more than 1 metre proud of the surface; a conservation-area home can carry them only on a rear elevation or a side elevation that does not front a road; and listed buildings and World Heritage Sites are excluded.
The city's list names 11 conservation areas, including Old Aberdeen, Rosemount, Footdee and Great Western Road. Aberdeenshire has around 40, running from central Stonehaven to the small coastal settlement of Pennan, and approximately 3,500 listed structures. Its page also lists consultations on the Huntly and Stonehaven conservation areas and an update to Peterhead's in the planning stages, so those three towns are worth checking at the time of an application. Part of the shire sits inside the Cairngorms National Park and is covered by the park's plan rather than the Aberdeenshire Local Development Plan, so an address near the park should be checked with the council before anything else.
Listed buildings sit outside Class 6HA altogether. Aberdeenshire Council's page says it is an offence to carry out unauthorised works to alter a listed building in any way that would affect its character, and Historic Environment Scotland's Managing Change guidance on micro-renewables sets out the principles applied to historic buildings.
What do granite and slate mean for panels?
Granite runs through Aberdeen's housing history. HES notes Rosemount Square (1938) as a European-style scheme clad in granite, and Thistle Court (1971), with 15 storeys and 126 flats, as having granite aggregate panels. A block of flats shares its roof, so the shared-roof questions on the Glasgow page apply. For older houses, HES's Engine Shed guidance says many traditional Scottish buildings have roofs covered with local slate, usually steep at around 40 degrees, that a lifespan of up to or beyond 100 years is quite common, and that slate has not been quarried in Scotland since the 1950s, so reusing existing slates is preferred. Aberdeen City Council's materials guidance adds that the majority of older buildings in the city have slate roofs. Replacement slates are hard to source, which makes the installer's slate fixing method the thing to ask about, and the slate roof guide covers the details.
What kinds of home does Aberdeenshire have?
Increasingly detached ones. Aberdeenshire's Census 2022 population was 263,900, up 4.3% on 2011, and its households rose 10.6% to 115,800, the third-highest rate of increase in Scotland. The National Records of Scotland say the biggest rise in households living in detached houses of any council area was in Aberdeenshire, at 7,000, and that 45.6% of its households had at least two more bedrooms than required. Across Scotland, 32.4% of households live in a tenement or purpose-built block of flats and 23.9% in detached houses. A detached house has its own roof, so the shared-roof questions that dominate city flats mostly fall away, and a garage or outbuilding can carry panels under Class 6HB, limited to 500 mm from the surface and not in the front curtilage.
Which network operator covers Aberdeen?
SSEN. The Energy Networks Association lists Scottish and Southern Electricity Networks for Northern Scotland, and SSEN's own releases describe its north of Scotland licence area as running from Dundee and Aberdeen to Argyll, the Highlands and the islands, with a North East network covering Aberdeenshire and most of Moray. A generator under 3.68 kW per phase falls under EREC G98 and a larger one under EREC G99. For the G98 route, SSEN's page says the Form B must be submitted no more than 28 days after commissioning, and that prior approval comes first if there is more than one generator at a single property or the total exceeds the G98 limits. The operator guide sets the operators side by side.
When does a building warrant apply?
A building warrant is a separate matter from planning. Argyll and Bute Council words its exemption for the roof of a single or two storey house whose existing structure can take the additional loading, and says a warrant is required if the roof needs strengthening. Aberdeenshire Council says work that needs no warrant must still comply with the building regulations, and it runs an online form for house proposals. A flat, or a house whose roof needs strengthening, is a question for the relevant council's building standards team.
What are the net zero targets, and where does cost fit?
Both councils point to 2045. Aberdeen City's Net Zero Aberdeen Routemap sets out a pathway to net zero by 2045, and Aberdeenshire Council's route map aims to cut its own emissions by 75% by the end of the decade and reach net zero by 2045. No prices appear on this page. The cost guide gives the Department for Energy Security and Net Zero's published figures with their basis, the Scotland page covers the national rules, and a reader with a north-east roof in mind can send an enquiry through the site's form.
Solar installation questions in Aberdeen and Aberdeenshire
Does Aberdeen get enough sun for solar panels?
PVGIS models a south-facing roof at 35 degrees in Aberdeen at about 893 kWh per kWp a year, about 12% below London and about 5% above Glasgow. June is only about 4% below London, while December is about 42% below. A site assessment gives the figure for a particular roof.
Do I deal with Aberdeen City Council or Aberdeenshire Council?
The council for the address deals with planning, and the two are separate planning authorities. Part of Aberdeenshire lies in the Cairngorms National Park and is covered by the park plan instead of the Aberdeenshire Local Development Plan. The councils can confirm which applies.
Can panels go on a granite house in an Aberdeen conservation area?
Under Class 6HA they can go on a rear elevation, or a side elevation that does not front a road, unless the building is listed. The city has 11 conservation areas and the shire around 40, so the council can confirm whether an address is inside one and which elevation counts as the principal one.
When does SSEN need to approve a system before it is connected?
For a system under 3.68 kW per phase, SSEN requires the G98 Form B after commissioning. It requires prior approval if there is more than one generator at a single property, if the same installer has put generation into another property in the same postcode area in the last 28 days, or if the total exceeds the G98 limits.
Grid paperwork in Aberdeen and Aberdeenshire: what to expect
Whoever installs in Aberdeen and Aberdeenshire, the grid-connection rules are the same: up to 16 A per phase the installer notifies your network operator after commissioning (G98); larger and battery systems need a G99 application approved before anything is energised. Your operator is the company that owns the local wires, not your supplier — you can confirm it via the Energy Networks Association. An installer who can't name your DNO unprompted hasn't done many local jobs.
We don't invent "Aberdeen and Aberdeenshire prices" — labour moves costs 10–15% either side of the national average, and the honest numbers live in one place: the 2026 installation cost guide, including the DESNZ 2025/26 medians, Smart Export Guarantee context and what actually moves a quote.