Solar panel installation in Northern Ireland: the rules, the grid and getting paid for export

A guide to the planning order, the grid connection and the sunshine figures for a house in Northern Ireland, with the points that differ from Great Britain set out in one table.

Is there help paying for solar panels in Northern Ireland?

For most homeowners, no: nidirect says there is no financial support for homeowners who want to generate their own electricity, so most people in Northern Ireland pay for solar themselves. Two narrow routes exist, and neither is open to everyone.

The Northern Ireland Sustainable Energy Programme lists a Toasty Homes heat pump and solar scheme for 2026/27. It can fund solar panels, a battery and a heat pump as one package for owner-occupiers with a gross household income under £28,000 (single) or £35,000 (couple or family) whose heating meets its tests, for example no central heating, or an oil or LPG boiler that is more than 15 years old or broken beyond economic repair. It runs while its funds last.

The Housing Executive’s Priority PV scheme fits panels, a hybrid inverter and a battery to some of its own single-storey homes off the gas network that are heated by oil or electricity. The programme pays half and the Housing Executive the rest, an income test applies (under £28,000 single, £35,000 couple or family), and the Housing Executive chooses the homes, so tenants do not apply.

The Affordable Warmth Scheme’s listed measures (insulation, gas or oil heating, windows and solid wall insulation) do not include solar.

If no scheme fits: what lowers the cost

How does solar panel installation in Northern Ireland differ from Great Britain?

Northern Ireland has its own planning order, its own network operator and no Smart Export Guarantee, so a guide written for England misleads in several places. Anyone ready to move on can send an enquiry through the site's form.

TopicNorthern Ireland
PlanningPart 2 of the 2015 permitted development order, with its own roof, wall and stand-alone limits
GridNIE Networks: G98/NI up to 16 A per phase (3.68 kVA single phase, 11.04 kW three-phase), G99/NI Fast Track and G99/NI above
ExportNo Smart Export Guarantee; each supplier sets its own export terms
MCS certificateGreat Britain's export scheme asks for one; Northern Ireland has no such scheme, so ask the supplier
VAT0% on solar panel installations in homes from 1 May 2023 to 31 March 2027, then 5%, under the HMRC notice
Official cost seriesThe Department for Energy Security and Net Zero series covers England, Scotland and Wales only

Do solar panels need planning permission in Northern Ireland?

Often not. Roof panels on a house are permitted development under Part 2 of the 2015 order, Class A, which covers the roof of a dwellinghouse or of a building in its curtilage. The limits are specific: panels must not protrude more than 20 centimetres beyond a roof slope that faces onto and is visible from a road, must not rise above the highest part of a ridged roof or more than 1.5 metres above a flat roof, and must not extend beyond the edge of the roof.

Designated land changes the answer. In a conservation area or World Heritage Site, panels are not permitted development on a roof slope that faces onto and is visible from a road, and inside the curtilage of a listed building they need listed building consent first. Stand-alone arrays under Class C are limited to 14 square metres and 2 metres in height.

Planning decisions are shared between eleven councils and the Department for Infrastructure, and each council has a local planning office. nidirect warns that getting permission after a system is in place can be difficult and expensive, so the check belongs before the roof is touched. England's changes of 27 August 2026 (SI 2026/896) amend the England order only and do not alter the Northern Ireland text.

How does NIE Networks connect a solar installation?

NIE Networks is the network operator listed for Northern Ireland, and its generation connections page sorts a home installation into one of three routes. G98/NI covers up to 16 A per phase, which is 3.68 kVA on single phase or 11.04 kW on three-phase. G99/NI Fast Track covers up to 60 A per phase with the inverter limited to 32 A per phase and export limited to 16 A per phase. Anything beyond that needs a full G99/NI application. The installer typically makes the application on the householder's behalf.

Timing is the practical difference. Under G98/NI the installer connects first and has 30 days from commissioning to submit the documents. G99/NI is not a "Fit and Inform" process: approval must be granted before installation begins. NIE Networks widened Fast Track on 1 May 2026, raising the limit to 60 A per phase from 16 A.

Capacity varies by substation. NIE Networks publishes a network capacity map, which it describes as a general illustration that cannot be relied on for specific premises. Its G99/NI page also records that, after upgrade works at Limavady Main Substation, it would accept generation export applications from 15 September 2026 under temporary rules, so export capacity is not uniform. The G98 and G99 guide covers the two routes in more detail.

Who pays for exported electricity when there is no Smart Export Guarantee?

The electricity supplier does, if its terms allow. The Energy Saving Trust states that SEG tariffs aren't available in Northern Ireland, that specific suppliers may have their own export tariffs and that regulated suppliers have to provide export terms to relevant microgenerators. NIE Networks adds that it takes no part in that step: "this is a contract between you and your electricity supplier". Power NI, for example, lists 11.88p per kWh for exports from 1 October 2026 to 30 September 2027.

Because the terms are the supplier's, they can differ between suppliers and change over time. The guide to Northern Ireland solar export payments covers how to compare them. In Great Britain the SEG usually needs an eligible system, MCS certification and a smart meter, which is why the MCS certificate guide is worth reading before agreeing any export contract.

How much sun do Belfast, Derry and Enniskillen get?

Noticeably less than southern England. The European Commission's PVGIS tool models a 1 kWp system tilted at 35 degrees, facing due south, with 14% losses. Southampton is added as a southern comparison.

PlacekWh per kWp per yearAgainst Southampton
Belfast919about 14% lower
Enniskillen853about 20% lower
Derry/Londonderry841about 21% lower
Southampton1,064baseline

Winter is where the gap shows. PVGIS puts December in Belfast at 26.32 kWh per kWp against 36.26 in Southampton. The Met Office 1991-2020 average for Belfast Newforge is 1,277.04 sunshine hours a year, with 35.31 in December.

What do Northern Ireland homes mean for solar?

NISRA counted 1,903,175 people in 768,810 households at the 2021 census. The answers on renewable energy systems vary by council area: 4,869 households in Belfast reported one (about 3.3%), against 4,112 in Derry City and Strabane (about 6.7%) and 3,130 in Causeway Coast and Glens (about 5.4%).

Housing type explains part of that. In Belfast 29,390 households live in a flat, maisonette, apartment or caravan against 119,818 in whole houses or bungalows, so roughly one in five may not control the roof; the flats guide covers that case.

The Climate Change Act (Northern Ireland) 2022 requires net emissions in 2050 to be at least 100% lower than the baseline, and the Department for the Economy reports the Act's target of at least 80% of electricity consumption from renewable sources by 2030. In the year to June 2026, solar supplied 6% of Northern Ireland's renewable generation and wind 74%. The Department for the Economy counts 32,342 solar PV sites in Northern Ireland, with installed solar capacity up from 6 MW in 2012 to 371 MW in 2024.

Do Great Britain's published figures apply in Northern Ireland?

No. The Department for Energy Security and Net Zero's solar PV cost data states that it applies to England, Scotland and Wales, and its 2025 to 2026 release was published on 28 May 2026. Its per-kilowatt medians are therefore not a Northern Ireland price list, and this page gives no Northern Ireland figure. The site's cost guide sets out the Great Britain series and its basis for comparison.

Scotland's rules differ again, as set out on the Scotland page.

Solar installation questions in Northern Ireland

Is there a Smart Export Guarantee tariff for a house in Belfast?

No. The Energy Saving Trust states that SEG tariffs aren't available in Northern Ireland. A supplier may offer its own export terms, and the contract is between the householder and that supplier. The export payments guide on this site explains what to compare.

Does a house in a Northern Ireland conservation area need planning permission for roof panels?

Often yes. Under Part 2 of the 2015 order, panels are not permitted development in a conservation area or World Heritage Site if the roof slope faces onto and is visible from a road. A slope that is not visible from a road is not caught by that limit, and the council's planning office can confirm the position for a specific address.

Does the 0% VAT rate on solar panels apply in Northern Ireland?

Yes, for installations in residential accommodation. HMRC's notice applies the zero rate to specified energy-saving materials, including solar panels, from 1 May 2023 to 31 March 2027. The rate reverts to 5% from 1 April 2027.

Who has to be told about a new solar installation in Northern Ireland?

NIE Networks. Under G98/NI the installer submits commissioning documents within 30 days of commissioning, and under G99/NI approval comes before work begins. NIE Networks says the installer typically makes the application on the householder's behalf.

Is solar worth it in Northern Ireland?

It can be, but the case is weaker than in southern England. PVGIS puts Belfast at 919 kWh per kWp a year against 1,064 in Southampton, and with no Smart Export Guarantee most of the value comes from the electricity you use yourself; Power NI's export rate is 11.88p per kWh to 30 September 2027. A south-facing roof, daytime use or a battery all improve it, and this guide gives no promise of a payback.

Guides on this topic

What a Northern Ireland solar quote should state

  • The system size in kWp and the number of panels.
  • The inverter size, and whether a separate battery inverter is added.
  • The NIE Networks route (G98/NI or G99/NI Fast Track) and who files it.
  • The export meter arrangement and which supplier will pay for exports.
  • The 0% VAT line.
  • Scaffolding, as its own line.