solarpanelsandinstallation

Replacing or adding to old solar panels without losing your Feed-in Tariff

Updated 23 October 2026 · SEO Dons Editorial

What can you do with a 10 to 15-year-old system?

You have three routes: replace a failed part like for like, replace the whole array, or add panels as an extension. Ofgem treats them differently. Its Feed-in Tariff (FIT) closed to new applicants on 1 April 2019, but accredited installations keep their support for the eligibility period, typically 20 years, and the Energy Saving Trust says existing contracts remain valid for 20 to 25 years. A system fitted between 2011 and 2016 may therefore have years of payments left, which is why the order of work matters.

RouteOfgem's positionWho to tell
Like-for-like repair or replacementYou may repair or replace some or all of the equipment without affecting accreditation, if the scheme rules still hold.Your FIT licensee
Replace the whole arrayAllowed as "some or all" of the equipment, but removing all plant up to the grid connection ends accreditation.Your FIT licensee, before the work
Add panels (an extension)No FIT payments on the additional capacity unless the extension was commissioned before 15 January 2016.Your FIT licensee and your network operator

Will replacing panels or equipment affect your Feed-in Tariff?

Not in itself. Ofgem says repair or replacement leaves accreditation untouched provided the installation still meets the scheme rules. Three of those matter to a homeowner:

  • the maximum capacity (5 megawatts) is not exceeded;
  • the installation keeps generating from the same technology, solar PV;
  • the installation is not decommissioned or relocated.

Ofgem also allows replacement equipment that was part of an earlier FIT or Renewables Obligation installation. Domestic systems are MCS-FIT installations, so you tell only your FIT licensee. Their statement of FIT terms continues for the eligibility period, and Ofgem lists replacing generating equipment and adding capacity among the changes you must report.

Watch the wording on size. Ofgem lists "replacing generating equipment with a larger or smaller TIC" as a modification to notify. Read with the extension rule below, higher-wattage panels that lift your total installed capacity may count as extra capacity. Ask your licensee, in writing and before the work, how it would treat that.

What happens to your Feed-in Tariff if you add panels?

You may add capacity, but Ofgem says you "cannot receive FIT payments in respect of electricity generated from any additional capacity" unless the extension was commissioned before 15 January 2016. Where the generation meter records both accredited and non-accredited panels, payments are pro-rated.

So ask the installer how the new panels will be metered and ask your licensee how it would pro-rate. Ofgem adds that you cannot receive both Smart Export Guarantee payments and FIT export payments for the same electricity, and must opt out of FIT export payments before registering for the SEG. Whether the added panels' exports can be paid separately is a question for your licensee and SEG supplier.

Where does the inverter fit in?

Inverters run on a shorter clock than panels. The Energy Saving Trust says an inverter generally needs replacing after around 12 years, and MCS says panels themselves can last over 25 years but the inverter may need replacing during that time. Ofgem's FAQ speaks of "equipment" and "generating equipment" without listing parts, so ask your licensee in writing whether it wants notice of an inverter swap and send it the installer's paperwork.

A bigger inverter also matters for the grid. One network operator, Electricity North West, says the rating of an installation with an inverter is assumed to be the inverter's continuous steady state rating, which decides the route below. The lifespan guide covers the parts that wear out.

Do you need to tell your network operator?

Yes. GOV.UK says you must notify your local network operator (DNO) of any significant change to your connection, and installing solar PV or battery storage is given as an example. The route depends on the new total:

  • Connect and notify. The installer fits the device and submits the G98 form within 28 days of installation. ENWL says G98 covers installations up to 16 amps per phase, which is 3.68 kW on a single phase.
  • Apply to connect. Larger totals need the G99 form submitted before installation.

Adding to an old system raises a snag. National Grid's notification-only category counts "the total of all ratings", existing and new, and requires all existing and new generation to be fully type tested. GOV.UK adds that where a device is not type tested, the DNO may ask for extra documentation. Ask your installer to check the old inverter and make the application, and to give you the DNO's confirmation, because the owner is responsible for ensuring the DNO has received it. The G98 and G99 guide explains the forms.

What if a meter is replaced as part of the job?

Tell your licensee. Ofgem lists a generation or export meter being replaced, removed or starting to measure electricity from outside the accredited installation among the changes to notify, alongside any other modification. If a smart meter is part of the plan, Ofgem says your generation payments will not be affected, but deemed export payments stop and you are paid for the export the meter records. The meters guide explains which meter does what.

What should the quote say?

  • The system capacity in kW before and after the work, and the inverter's rating.
  • Whether panels are being replaced, added or both, and how the new generation will be metered.
  • Which network operator route applies and who submits the form.
  • Which paperwork you will receive for your licensee and for your own records.
  • Any roof work, scaffolding, or removal and refitting that is included or left out.

In what order should you do it?

  1. Find your FIT licensee and your statement of FIT terms. If you moved in, Ofgem can tell you which licensee the panels are registered with.
  2. Ask the installer to state the system's capacity in kW before and after the work.
  3. Ask your licensee in writing how the work will be treated and how the meters will work.
  4. If the roof is also due work, plan the removal and refit first: see removal and reinstallation for roof work, and why people remove panels.
  5. Have an MCS certified installer carry out the work and make the DNO notification, and keep the confirmation.
  6. Send your licensee the installer's paperwork for the change.

The cost guide shows what a written quote should itemise, and the pitched-roof installation page describes the standard on-roof method.

Sources

Common questions

Can I replace failed panels with a different make or size?

Ofgem lets you replace some or all of the equipment without affecting accreditation, provided the capacity limit holds, the technology stays solar PV and the installation is not decommissioned or relocated. A larger total capacity is treated differently, so tell your FIT licensee the new kilowatt figure before the work.

Is it worth replacing 15-year-old panels?

The official sources read give no replace-or-keep rule. The Energy Saving Trust and MCS say panels can last 25 years or more, and Ofgem's rules allow replacement without losing accreditation. The decision turns on whether parts have failed, whether the roof needs work and what your licensee confirms.

Can I take Feed-in Tariff panels with me when I move?

Ofgem lists 'not decommissioned or relocated' among the conditions for keeping accreditation after a replacement, so relocation is not covered by that allowance. For a sale, Ofgem says the new owner of an MCS-FIT installation contacts the registered licensee, who updates the generator's details.

How do I find out which company pays my Feed-in Tariff?

Your statement of FIT terms names your licensee. If you have moved into a house with panels, Ofgem says it can tell you whether they are registered and with which licensee, through the request route on its dispute resolution page.

Get an installation quote

By submitting you agree to our privacy policy. We never sell your details.

Get a quote
Get a quote